TO THE RESOLUTION OP PROBLEMS, 9?
H
whence each of the three last equations being succes*
sively subtracted, we get
1 _ 1 1 1 _ be + ac + ab
z 2a 2b 2c ~ 2abc *
i _ _1 1 I __ be — ac + ab
y ~ 2a 2 b 2 c ~~ 2 abc
-*- = J- + _L L = te 4 ac-ab_ Hence
x 2a 2b 2c 2abc
2 abc
1440
be
be + ac + ab ~ — 90 + 80+72
2 abc _ 1440
— ac + ab
- 23*,
90
-80+72
___ 1440
be + ac — ab ~~ 90 + SO — 72
2abc
= 17H.
= 14^.
Otherwise,
Let the work performed by A in one day be de
moted by 07: then his work in a days will be ax, and in
b days it will be bx ; therefore the work of B in a days
will be 1 — ax; and that of C, in b days, 1 — bx, by
the conditions of the problem; whence it follows
that the work of B, in one day, will be expressed by
-— an d that of C, in one day, by -—; but
i
the sum of these two last is, by the question, equal to —
part of the whole work, that is, ~~ + — 2a? = ~ §
whence x
JL +JL
2 a 2 b
JL
2C
b
ôc + ac-
•ab
2 abc
, equal
to the work done by A in one day; by which divide
1 (the whole) and the quotient, ¿ c ab*
the required number of days in which he can finish the
whole,