Full text: Commissions II (Cont.) (Part 4)

-18- 
The operating airport was Beira, 750 Kms away from the 
head office in Lourengo Marques, and at a distance of 250 Kms from the 
center of the area flown. This mission lasted 8 days which, owing to 
the metereological conditions of the area, has to be considered rather 
fortunate. 
Although the films were developed in Lourenpo Marques a 
small gap occurring between strips 1 and 2 could be reflown immediately 
by cabling the geographical coordinates of the filling strip ends. 
It must be said that the existing aerial photography 1/50.000 
as well as the good references in the river simplified the execution 
of the photo coverage very much. Thus, the low percentage of rejected 
photography can be understood. 
2.- OFFICE WORK 
WORK 
EXECUTION 
UNITARY 
STEPS OF THE WORK 
TIME IN 
TIME IN 
STAGES 
MAN-HOURS 
MAN-HOURS 
0 
H > 
Eh 
ru 
Index map l/lOO.OOO, drawn on millimetric paper 
by pantographic reduction of the 1/50,000 map 
series and containing only the hydrography, 
roads and localities 
31 
0.17 
Subdivision into mosaics and plotting of 274 
19 
k 
■< 
Ph 
£3 
control points on the index map (286 mosaics) 
Ph 
Identification and transfer of 210 control 
1 
points (out of 274) from the 1/50.000 photogra 
phy into the 1/20.000 new photography 
51 
0.19 
Selection and point transfer of the tie and 
carry over points of 1.244 photographs 
698 
0.56 
Preparating and cutting 1.244 templets 
273 
0.22 
Eh 
3 
% 
Construction of four 25 oms. grids (6 meters 
long x 1 meter wide) 
148 
37.00 
Trimming and assembling 
341 
. 0.27 
l 
P 
r.n 
Transfer of the slotted templet control, per 
179 
0.14 
in 
Eh 
O 
strips, onto transparent bands. (1.244 photos) 
P 
U1 
Enlargement of the slotted templet control, in 
the Wild E3, to the scale l/lO.OOO (1.244 pho 
tographs) 
314 
0.25 
-
	        
Waiting...

Note to user

Dear user,

In response to current developments in the web technology used by the Goobi viewer, the software no longer supports your browser.

Please use one of the following browsers to display this page correctly.

Thank you.