Continuation: TABLE N° 2
TRIANGULATED STRIPS WITH THE INSTRUMENTAL METHOD
24
n5
Ct
26
Country
SWEDEN
SWITZERLAND!
TURKEY
survey
purpose
Flight
Organization
map scale
— Photo-
1 Tac PESE hin
total area | Cameras | graphic
material
The State Power 1 : 40.000
Board 1 : 10.000 |
1421 models |
|1 : 4.000 |
|1 : 1,000 |
12,103 models | |
| |, Ji
The Roads and i : 2.000 |
Waterways Ad- |l: 4.000 |
ministration 1100 models
|a year
1 : 10.000
] : 8.000
] : 4.000
200 models
a year
For study
purpose: see
paper «Ste-|
reotriangula- |
tion with pho-
tographs from
10.000 m alti- |
tude » |
| Int. Hyd.Rev.
|Nov. 1958
The Hydrogra-
phie Depart-
ment of the Na-
tional Board of
Shipping and
Navigation.
Division of Pho- |Study pur-
togrammetry at |poses
|
the Royal Insti- |
tute of Techno-|
logy
Three private [100 models
Agencies each
E. T. H. Zurich |Study pur-|R.C. 7 plates
Photogramme- |poses
trisches Institut
Strip N
Block Verco-
ors
Many strips
for the O.E.
E.P.E.
Turkish Geode-
tie Service
i Flight
Camera =
: altitude
calibra-
tion and
| direction
4.000 m
2.000 m
11.500 m
14.000 m
2.000 m
10.000 m
2.200 m
8.000 m
Photo
scale
Overlap Auxiliary
and T.
^ equip-
strip ments
length
Ground
character-
istics
Total
for
strips
number
9 models |Statoscope
52 km
lon the terrain.
Ground control points |—
Position of
control points Type
in the strip
= -———|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
| |
Control points are|Natural de-|
usually available/tails for
after four - five mo- photo-
|dels. Sometimes in- graphs
dipendent distances|from 4.000|
in intermediate mo-|m other-|
|dels are measured wise signal-|
lled points
Use of the telluro-
meter
At the beginning,
in the middle and
at the end.
Bridging
Bridging characteristics
Plotting instruments
Dos 1] P iL
Di iis Ld: | Thermical Operators | Relative
Plotting Preli- | character- | at and
instru- minary istics | and Bridging absolute
ments tests of | working method orientation
rooms | shifts of models
| :
Balplex | | Model trian-
Kelsh | | gulation me-
| | | thod
A. 7 | | |
A. 8 | |
| |
| |
— j= — | ieee eee, =] ———] L—À————————— — |
A. 8 |Grid test in | Model trian- |
Ithe indivi-| | gulation me- |
|dual projec- | | |thod |
Itorand with | | | | |
\model me- | |
thod | | |
| | | |
Balplex [Single grid] |
|method |
|
= = : —— |
A. 7 Single grid Combination |All models are
measure - between mo-|checked with y -
ment |del and block parallax measu-
triangulation rements
|
Model trian-{ Numerical me-|
|gulation and|thod
|ordinary ae- |
rial triangula- |
[tion
|
À. 7 Indipendent| |
The strip triangulation is used for bridging one or two models between models that contain the required number of control points
model
gulation
| . .
free bridging |
trian-|
|
|
d
Adjustment of|
A. distortion |
B. refraction | Planimetry
shrinkage
Adjustment of strips
| Use of data, Use | Use of
| |
AWimetry | from of : other
auxiliary | electronic | equip-
|
equipments, computers | ment
| |
Graphical mo-
del triangula-
tion
Numerical mo-
del triangula-
tion
|
11,5-9 hours
|
|
tn | tee
|
Facit EDB |
| |
|
|The coordinate
[transformation
[to the ground
lis made as si-
|milarity trans-
[formation
|
|
|
|
|
|
|
|
|
|
^]
(See methods which are
in Geographical Survey office
Use : :
of data Time N° of
from | required | repe- |
auxiliary for model | titions | C. film |
equipments |
|
| |
|
|
|
|
| |
|
|Statoscope |3-4 hours | 2
|
| Facit EDB
used
Reached percision
Mean errors
Tests
%
Z
y
0,15-0,20 per thou-
sands of flight altitude
+ 2 m
The practical result showed satisfac-
tory agreements with the theory
3,4 m
+ 2,7 m
+ 3,0 m
| -- 2,5 m
See the O.E.E.P.E. Com. A. Report