AZgr=(AZy+AZz+AZz+AZ2,):4 - height of prism above hori-
zontal plane.
In the second case, the area p located inside polygon is
multiplied by prism height, calculated as given above and
V=p AZsr
Total volume per section is obtained through adding volumes
from particular meshes,and for the whole object individual
sections are summed up.
Influence of height errors on accuracy of volume determina-
tion for 1 ha can be estimated as follows:
dV210000 s - systematic deviation influence
mV= 400 m - random error influence.
As can be seen, systematic deviation has the principal
influence on determined volume. Therefore it is better to
calculate volume increase at a certain period /usually
annually/. Then, using similar aerial photographs, impact
of systematic deviation is reduced and accuracy increases.
During implementation of the described method in survey
ing enterprises, comparison with the earlier used methods
was performed. In the State Enterprise of Geodesy and
Cartography in Warsaw volume of the reservoir of flotating
muck was determined, using method described by S. Dmocho-
wski and R. Butowtt in the article:'Determination of volu-
me of materials deposited in sedimentary reservoirs', and
using above described method. The corresponding volumes
were:
in first case 2 14.960 180 m
in second case -.15:132.245 m
The difference was 172 065 m, which ts about 1,15 % of
determined volume.
Volume of phosphogypsum dump determined by Gdansk Regional
Enterprise of Geodesy and Cartography, was calculated
multiplying area by mean height taken from height map.
The following magnitudes were obtained:
- on the basis of the map - 475 750 m
- on the basis of DTU = 153 732 m
so the difference was only 2.01 .
- 207 -