Full text: Commissions III and IV (Part 5)

  
  
  
  
  
  
  
  
16 
  
1000 FEET 
Stereogram 2. Highway route revision. The revision was made to avoid the 
industrial area, to achieve a nearly right angle crossing of the pipe line in 
the center of the strip clearing, which is the wide white band across the 
stereogram, to descend the drainageway on firm ground without resorting to 
curvature sharper than desirable, and to utilize the existing bridge seen near 
the top left of the stereogram. 
Parallax measurements were made to determine differences in elevation and 
to place the route on a gradient which does not exceed the maximum permissible. 
Note that when the right photograph was taken, direct sunlight was reflected 
into the camera lens from the clear water of the sawmill pond.
	        
Waiting...

Note to user

Dear user,

In response to current developments in the web technology used by the Goobi viewer, the software no longer supports your browser.

Please use one of the following browsers to display this page correctly.

Thank you.