Full text: Proceedings, XXth congress (Part 7)

2004 
Set 
1set 
  
nd of 
pint 1s 
d 
econd 
study 
ngular 
grade 
t. The 
/hang- 
of the 
nit : m) 
1 
‚720 
220 
600 
630 
  
  
570 
ng Mt. 
International Archives of the Photogrammetry, Remote Sensing and Spatial Information Sciences, Vol XXXV, Part B7. Istanbul 2004 
    
Picture 3.1 stone | 
San Mt.(right) 
3.2.13 GPS mission planning 
In this stage, the present condition of GPS satellites 
arrangement and the work session is determined, which is 
accomplished before the field surveying. GPS positions the 
location by the satellites. So the arrangement of the satellites 
affects the accuracy of this surveying very much. In this reason 
GPS surveying should be carried out in the better arrangement 
of satellites. It is possible to check the arrangement of satellites 
by using the value of DOP. Generally if the value of DOP is 
less than 4, it's OK. And if it is required to do more accurate 
GPS surveying, it is good to do the surveying in the condition 
the value of DOP is less than 2. 
In the GPS surveying of this study, the work session was 
determined in the condition the DOP value is 'below 2' which 
is set to the standard. 
The figure 3.2 shows the present condition of the satellites 
arrangement to do the GPS Static surveying. 
Visible Satellites : 
  
z 
o 
UTC Time : 2004/02/04 
huit RSA MF PTR BURG Fr RN D HET ten Wed 
  
             
    
DOP Plots 
1 
à 
*s p RADEON LE IE ane Wes dg 
Mike LAG. a! A cM die d BEEN 
TEEU. 4€ WUPE. . . Deoa. C PRORA ovas ur Tire eod 
  
Figure 3.2 The situation of satellites arrangement 
1217 
The table 3.3 is the work session to have accomplished the 
GPS Static surveying in this study. 
Table 3.3 Session table 
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
Sessi Receiver l|Receiver 2| Receiver 3 |Receiver 4| Receiver 5 
ession : 
Ant. Hight'Ant. Hight| Ant. Hight |Ant. Hight| Ant. Hight 
; Um- |Bong-Lae| Whang- Keum- | Jang-San 
Session 1 |, 
Gaung Mt. Mt. Lyung Mt. | Ryun Mt. Mt. 1 
8:30-- 9:30 |... 1.325 1.162 1:212 1.545 1.335 |. 
Session 2 Um- |Bong-Lae| Whang- |Gwang An| Baek-Un 
ie Gaung Mt| Mt. Lyung Mt. | Beach port 
3 leo ^. : 
um LME 3405 [24996 1.163 1.542 1.566 
. . 3, | Da-Dae | Nam Bu | Whang- il Hedin 
Session 3 port Min Lyung Mt. Wharf 1 Wharf 2 
M ru 1.473 | 1444 1.153 1.583 1.557 
3.3.1.3 GPS surveying 
The third stage is for carrying out the GPS Static surveying. 
Picture 3.2 The picture of GPS Static Surveying is performed. 
GPS Static surveying has divided into total 3 sessions and 
accomplished. In the first session GPS Static surveying was 
done in the five triangular points. And in the second, third 
session, the GPS control point surveying was done to do the 
matching of Digital Map and Digital Chart. 
The figure 3.3 is the GPS observed point to be carried out in 
this study. 
BONE A 
P ANS 
e 
     
Figure 3.2 shows the part-look to carry out the GPS Static 
surveying among work sessions. 
La 
 
	        
Waiting...

Note to user

Dear user,

In response to current developments in the web technology used by the Goobi viewer, the software no longer supports your browser.

Please use one of the following browsers to display this page correctly.

Thank you.