Full text: Technical Commission VIII (B8)

5. ACCURACY ANALYSIS OF PRISM MEASUERD TREE 
HEIGHT 
5.1 Theoretical Accuracy Analysis 
In the Study, photogrammetric measurement of forest plays veryimpor- 
tant role. Especially, the accuracy of the tree height measurements is 
the most critical technology for supporting forest carbon stock model 
based on the upper tree height. A theoretical analysis of the tree height 
measurement accuracy was first carried out. According to the researchs 
(Uchida et al.,2008), the theoretical accuracy of planimetry and height 
in measurement of stereo satellite images is generally 
expressed as follows: 
ox=0y=Hf x o, (1) 
oz= HBXHf x o, 
where ox, oy: Theoretical accuracy of planimetry 
oz: Theoretical accuracy of elevation 
o,; Measurement accuracy of image coordinates 
The value of o, is generally 0.2 - 0.5 pixels, but can be 1 pixel 
maximum. Here, value of g,= 0.5 pixel was assumed and 0.2.5 m. 
52 Accuracy Analysis Comparing Tree Heights from 
ALOS/PRISM Measurements and Forest Plot Survey 
In order to verify the accuracy of tree height measurements, PRISM 
measured tree heights and the forest survey data were compared at 16 
plots. The results are as follows: 
- Standard deviation of discrepancies (errors): oz. 39m 
- Minimum discrepancy: 02m 
- Maximum discrepancy: 64m 
- Mean PRISM measured tree height: 20.2 m 
- Mean field measured tree height: 20.1 m 
- Difference of the mean values: 0.1 m 
These values were very similar to the result of the previous study in 
Vietnam. 
5.3 Accuracy Analysis using PRISM Images Before and After 
Forest Cutting. 
In order to verify the accuracy of PRISM tree height measurements at 
estimated ground height, 146 locations showing conditions before- and 
after-forest-cutting were selected from ALOS/PRISM images acquired 
over LPB province in November 2007 and January 2010. Then, the 
estimated ground height and the height of the ground that can be 
visually confirmed at same location were measured on the before- and 
after-forest-cutting PRISM stereo images using a digital stereo plotter. 
The ground elevations measured on two PRISM images were 
compared to estimate accuracy of the estimated ground heights. As a 
results of verification at 146 selected points, the amount of 
discrepancies was oz,=4.4 m (standard deviation) ranging from 0.0 m 
to 11.6 m. Furthermore, the measurement accuracy of PRISM 
measured tree heights oz can be estimated trough applying the error 
propagation principle: 
Om -SQRI(Z + Oz, ) zsim 2) 
where the theoretical error is assumed to be 0.5 pixel. 
International Archives of the Photogrammetry, Remote Sensing and Spatial Information Sciences, Volume XXXIX-B8, 2012 
XXII ISPRS Congress, 25 August — 01 September 2012, Melbourne, Australia 
   
  
   
  
  
     
  
  
   
   
   
   
   
   
   
   
    
     
    
   
    
   
    
   
   
   
   
   
   
     
   
    
  
   
   
   
   
   
   
   
   
   
   
   
   
   
   
    
Various parameters affecting the accuracy of the PRISM measured tree 
height were examined. And, it was shown that the most important 
factor is slope of terrain and associated sun light illumination (aspect). 
From these results, it can be said that it is necessary to measure tree 
height with special care when the slope is steep. 
6. SUMMARY 
Some results of the case study on MRV system for REDD+ in Lao 
PDR and improved methods for reducing difficulty of forst surveys at 
isolated areas and for estimating forest carbon stock using biomass 
classing were reported in this paper. The results of accuracy analyses of 
tree height measurement utilizing ALOS/PRISM showed that the error 
of the mean value of many measurements is reasonably well even 
though the errors of individual observtions are relatively large. From 
the results of the Study, the tree height data from sreteo satellite images 
can be used as at least effective additional data for forest carbon stock 
estimation based on ordinary forest surveys on the ground. The same 
thing can be said to the forest biomass classing data. The scope of 
MRV in the REDD+ mechanism is broad and complex as forests 
themselves are. It is very important to do some traial studies before 
establishing an actual MRV system in practice as shown in this paper 
since it is needed to establish a sustainable MRV system for REDD+. 
Acknowledgements: 
Authors would like to express sincere gratitude for the supports, 
cooperation and advices offered by the Forest Agency, Ministry of 
Agriculture, Forestry and Fishery, Japan, the Department of Forestry 
and Forest Inventory and Planning Division (FIPD), Ministry of 
Agriculture and Forestry, Lao PDR, and the Advisory Committee 
(Chaired by Dr. Haruo SAWADA, Professor of the University of 
Tokyo) in the Study. 
References: 
l. Asia Air Survey Co., Ltd.2011. Progress Report of the Study on 
the Strengthening of Methodological and Technological Approaches 
for Reducing Deforestation and Forest Degradation within the REDD 
Implementation Framework, http://www.ffpri.affrc.go.jp/redd-rdc/ja/ 
reference/list-02.html. 
2. GOFC-GOLD,2010. Sourcebook of methods and procedures for 
monitoring and reporting anthropogenic greenhouse gas emissions and 
removals caused by deforestation, gains and losses of carbon stocks in 
forest remaining forests, and reforestation COP17 version 1. 
3. IPCC, 2006. IPCC Guidelines for National Greenhouse Gas 
Inventories, http:/www.ipcc-nggip.iges.or.jp/public/2006gl/index html. 
4. IPCC,2003. GPG-LULUCF (Good Practice Guidance for Land 
Use, Land-Use Chang and Forestry), http://www.ipcc-nggip.iges.orjp/ 
public/epglulucf/epglulucf contents.html. 
5. Kamusoko, Courage et al.,2011. Spatial Simulation Modelling of 
Future Forest Cover Change Scenarios in Luangprabang Province, Lao 
PDR, Forests 2011, 2(3), http;/www.mdpi.com/1999-4907/2/3/107/. 
6. Uchida,S.,2008. Evaluation about the precision on the figure of the 
medium- and high-levels resolution satellite image, 2008 photographic 
surveying society memoir, Japan. 
  
Bai 
KEY 
ABS 
Man 
sea-l 
Becz 
erosi 
eros 
many 
and 
trans 
anal 
and 
coas 
anth 
shou 
ther: 
The 
indu 
emi: 
à ra] 
atm: 
201! 
con 
are | 
200 
the 
fort] 
in o 
The 
like 
in ] 
asp 
prec 
sho 
fror 
ove 
the 
200 
the: 
Bay 
pro! 
Woi 
Ma 
dec 
lev 
cha
	        
Waiting...

Note to user

Dear user,

In response to current developments in the web technology used by the Goobi viewer, the software no longer supports your browser.

Please use one of the following browsers to display this page correctly.

Thank you.