Mv
* To determine location and water pressure of
water factory, tower, pump.
* To determine the big consumers' consum-
ption and the nodes them belong to.
[ Data Preparation ]
V
Parameter Deduction A
Pipe Net Adjustment |
Pipe Net Optimization |
Result Display
( Figure 1. Establishment of optimal model in urban infrastructure )
3.3.2 Parameter Deduction
It needs to deduce some medium parameters from
formulas after data preparation. These parameters
include: overall length of pipe line, total water
consumption of big consumers, flow of each node,
and so on, then system distributes preliminary flow
and calculates the economical
speed of flow.
3.3.3 Pipe Net Adjustment
Determined the position of water factory, water
tower, water pump, and given out the most
unfavorable point or the lest pressure of water,
system derives the loss of water pressure from the
parameters matrix and calculates the flow of pipe
section. granting system a threshold ( for example
0.0001), when the maximal difference of the pipe
section flow which is obtained after twice adjust-
threshold, it finishes the
procedure of repeated adjustment.
ment less than the
3.3.4 Pipe Net Optimization
365
Changes of block factors must bring new
requirement to the infrastructure, so it needs to
rebuild dynamic balance. The following figure is a
flow chart of pipe net optimization, it describes the
whole procedure of pipe net optimization in detail
(figure 2.).
When factors of some blocks change, such as Floor
Area Ratio, population, building density (etc.),
updating the indexes of blocks directly on the
computer, deriving the volume of water, and
distributing it to the relative nodes, system can
calculate the optimal diameter of pipe through
pipe adjustment now. Comparing the diameter of
the designed pipe and the current pipe, system
diagnoses results automatically : if the diameter
of designed pipe is less than or equal to the
current one, it shows that the pipe can still
satisfy the requirements when block capacity has
changed, otherwise, it shows the pipe has been
overloaded and need to be renewed into a designed
pipe with bigger diameter. System also prompts
user to update with red flash. After updating the
pipe diameter, system repeats the procedures
described upon , until it satisfies the balance
International Archives of Photogrammetry and Remote Sensing. Vol. XXXI, Part B4. Vienna 1996