Full text: XVIIIth Congress (Part B4)

railway design. The RGIS provide spatial informa- 
tions from different sources. It can decide the accu- 
racy location of railway line. The satellite images 
can provide rich surface information of the earth. 
The automatic new railway line selected system is 
subprogram of the RGIS. It can select the railway 
line on the screen of the computer to adopt the rail- 
way line that closely follows. the profile of the 
ground and to use construction materials that occur 
near the railway line. This system can quickly find 
all possible railway line direction. At that time, the 
factors of influence every new railway direction 
mainly is the topographic factors. The more smaller 
the amount of fill earth and cut earth , the lower the 
construction cost. The more shorter length of rail- 
way line, the better transportation conditions. A 
topographic map drawn on a scale of one to fifty 
thousand, main national highways, rivers, artificial 
buildings were entered by digitizer , using as a basic 
map for railway line selecting. The contour topo- 
graphic interval, Ah , is 10 m. In the railway de- 
sign, the maximum slope rate in the mountainous 
area is 12%. In the plain area the slope rate is 5% 
or 39$. The smaller slope rate the better transporta- 
tion condition. If we know the contoure topographic 
interval 4^ , the maximum slope rate of railway 
line s. Then it needs the horizontal distance on the 
map is 
Ah 
Ad Ah Ll 
S m 
1 
where x is the scale of the map. For example, in 
the one to fifty thousand map, 4h = 10m, s = 
12% 
10 + 1000 
Ah 
din = == 12% - 50000 — 16: 7mm 
+ 
m 
If the 4d,, smaller or equeal than the Ad which is 
the shortest horizontal distance between two ad ja- 
cent contour line, i.e. Adj; X: Ad . The means the 
terrain was flate, the railway line direction can use 
free slope rate. At that given start point, the rail- 
way line can choose in the straight line direction be- 
tween the start point and terminate point. If 
the Adi; > Ad , the means that the terrain is 
mountainous area. The railway line have to use the 
maximum slope rate. The railway line can not 
choose in the straight line direction between the 
start point and the terminate point. Then the given 
start point as a circle center, the 4d, as a radius, 
drawing a circle intersect a point of the next coun- 
tour line, linking the two points of start point and 
the newset point, get a straight line. The slope rate 
of the straight line is 12% along the topographic 
surface. This means that, a railway line on this 
straight line direction, the railway line are not need 
fill earth and cut earth. The constructure cost are 
the lowest. 
Then, with the newly set point as the start point 
the Ad;; as a radius, to make a similar search a- 
gain. Then, the optimum direstion is decided, and 
the start point is moved in that direction. Thus, 
this operation is repeated till the terminate point is 
reached. Along the optimum direction, matching 
suitable straight line and curve line, get a optimum 
new railway line. 
In practice, from the start point, the 4d,, as a ra- 
dius may intersecte two points on the next countour 
line. One point is the correct direction along the 
straight line between the start point and the termi- 
nate point. Other point may be in a different direc- 
tion leading the railway line in to a Wrong direction 
(see Fig. 1). Thus, the computer have to decide 
which direction is correct direction. Using a given 
algorithem , two angle 7, (between line at and ab, ), 
7, (between line at and ab, ) are computed, com- 
pared the 7, and 7, , choosing the line of smallest 
angle 7, is the optimum direction. 
  
Figure 1. Search Direction 
3. The Optimum Transportation Path 
Selected System : 
The Railway Transportation Information System 
(RTMIS) is the main part of the RGIS. It connects 
with more than six thousand railway stations dis- 
979 
International Archives of Photogrammetry and Remote Sensing. Vol. XXXI, Part B4. Vienna 1996 
 
	        
Waiting...

Note to user

Dear user,

In response to current developments in the web technology used by the Goobi viewer, the software no longer supports your browser.

Please use one of the following browsers to display this page correctly.

Thank you.