Enlargement
Dimensional
ne Auxiliary
Dimensional Line
Base Plate
T
Figure 1 CAD Plan of Base Plate
time and labor for the work.
For the above reasons, we have embarked on the
building-up of a measurement work backup system of
base plate position which is capable of reading the
design value of the base position automatically, making
sure of discrepancy between measured value and
design value right off while the measurement of base
position is going on and outputting the measurement
results automatically in a spread sheet form.
2. Measuring procedure and problems
The order of the measurement work of base plate
position is such that the design value of the base
position is read from the plan and after confirming the
measured value and design value by comparing with
each other with measurement of the base position, a
document is prepared. Figure 1 shows CAD plan of the
base plate. The number of base plates reaches as much
as 200 pieces per work site with 20 to 40 pieces of the
base set within a range of 10 square meters. The plan
has been made into CAD; however the work reading the
design value from the plan is done by hand and for all
bases, the worker reads the design value and puts the
248
value on record. For the measurement work of base
position, the total station type three dimensional
measuring instrument has been employed which
measures a distance and vertical and horizontal angle to
obtain a three dimensional coordinate value. Figure 2
shows the measurement condition of base plate with the
use of the total station. The measurement results are
recorded in a controller and after end of the
measurement, the measured values are printed out all
together.
Base Plate
Figure 2 Measurement Condition of Base Plate
The measu
imm w
allowable 2
less than
However, |
shape bein
error occur
twice orat
Also, since
measured
measurem
cannot be
document
much time
come abot
system caf
base positi
with the re
of docume
3.1 Syst
Figure 3 «
substantia