Full text: Proceedings of an International Workshop on New Developments in Geographic Information Systems

A DEM of 10m cell size was then built running appropriate programs from the first level match - see Fig. 5 
(the whiter the pixel value the higher the height of the pixel). At the end a small ortho-rectified image was 
produced. The result is illustrated in Fig. 6: a three dimensional perspective of the orthoimage draped over the 
DEM. The voids in the figures are areas where the point density per block is not sufficient to produce the DEM. 
Table 6. Intersection Results 
Point 
Long. 
Lat. 
RMS 
H (ellips) 
H (MHWM) 
H (map) 
108 
998903.0104 
1087527.1540 
7.259 
203.3035 
268.3 
297 
111 
996058.4595 
1089456.0574 
40.688 
396.6994 
461.7 
428 
Fig. 5. DEM 
Fig. 6. Ortho-Image Perspective View. 
183
	        
Waiting...

Note to user

Dear user,

In response to current developments in the web technology used by the Goobi viewer, the software no longer supports your browser.

Please use one of the following browsers to display this page correctly.

Thank you.