359
CIP A 2003 XIX th International Symposium, 30 September - 04 October, 2003, Antalya, Turkey
and foyer areas. The second part of cleaning was applied, using
scrappers, sponge and a metal hard brush, by scrubbing it
manually. Very little Liquid Organic Cleaner (LOC) was used
to enhance the process (See Figure 9).
Figure 8: Water jetting
The entire pitched roof over the great hall was replaced with
new steel frame and water-proof roof membrane). The design
basically reflected the original design with several
improvements in terms of acoustic, structural strength and
quality (Refer to Figure 10 & Figure 11).
Figure 11 : Completed new roof finishes
b) Second Stage - Architectural, Interior Design & Services
Installation
The important architectural features in DTC were retained and
the original design maintained. The main foyer area, the granite
flooring, facades and slab soffits, the services and mezzanine
level, spiral staircases and concrete handrails were retained (See
Figure 12 and Figure 13).
& : .
'xkç'm
Figure 12: Replacing the broken granite floors.
Figure 10: New roof trusses installation
Figure 13: Refining the existing concrete handrails.
The Interior Design Work was based on the new requirements
for new services systems and facilities in order to ensure that