In: Wagner W., Sz&cely, B. (eds.): ISPRS TC VII Symposium - 100 Years ISPRS, Vienna, Austria, July 5-7, 2010, IAPRS, Vol. XXXVIII, Part 7B
330
Figure 9. Extracted straight primitives (building 6)
Figure 10. Extracted straight primitives (building 7)
registration process. Figures 4 to 10 show the results of
extracted straight lines primitives for each building in the image.
3.3 Back projection
Optimal building primitives were back projected into image
space and figure 11 illustrates the result of each building.
Figure 12 shows a closed-up view of the back-projection on the
image of building 4. In this figure, the red lines represent the
optimal building primitives. Column 2 in Table 1 presents the
image coordinates of the optimal building primitives after back
projecting them into image space. The back projection results
show that there is a small difference in the image coordinates
between optimal building primitives projected into image and
the building image because of errors contained in the initial EO
parameters.
Figure 11. Results of back projecting into image space
Figure 12. Enlarged image of back-projected building 4
3.4 Similarity measurement and matching
Similarity measurement was carried out with a 10 pixel buffer
zone in search area. 30 pairs of coordinates corresponding to the
vertices of the optimal building primitives are automatically
obtained by computing the intersections of the new straight
lines after finding new location of optimal building primitives.
Table 1, column 3, shows the results of image coordinates
corresponding to the extracted optimal building primitives.
Table 1. Quantitative assessment with optimal building primitives
Optimal building primitives
(Object space)
Image coordinates
extracted manually(l)
Coordinates of Building
primitives projected into
image space(2)
Automatically extracted
coordinates by similarity
measurement^)
X(m)
Y(m)
Z(m)
X(pixel)
Y(pixel)
X(pixel)
Y(pixel)
X(pixel)
Y(pixel)
Building 1
620217.24
4848040.89
167.15
2916
5547
2921.22
5544.96
2915.14
5544.35
620146.18
4848017.03
167.15
3098
6094
3103.56
6091.23
3098.17
6092.96
620168.29
4847951.20
167.16
3604
5925
3609.60
5922.73
3607.72
5923.29
620239.31
4847975.04
167.16
3425
5380
3427.44
5376.69
3424.78
5374.92
Building 2
620285.81
4847945.87
175.68
3635
5032
3640.03
5027.56
3634.55
5031.68
620297.64
4847909.79
175.74
3915
4939
3919.02
4936.86
3914.40
4940.70
620350.87
4847927.55
174.70
3778
4526
3783.92
4524.45
3778.02
4524.42
620338.85
4847963.57
175.75
3498
4619
3503.87
4617.28
3497.11
4617.53
Building 3
620386.56
4847837.71
174.96
4476
4252
4478.37
4250.46
4475.77
4251.39
620406.61
4847776.84
175.01
4951
4096
4949.13
4096.63
4952.36
4095.65
620442.84
4847788.77
175.05
4858
3814
4857.49
3816.35
4860.45
3814.55
620422.79
4847849.64
174.82
4384
3970
4386.87
3970.20
4384.00
3970.30
Building 4
620550.63
4848063.44
169.83
2739
2980
2746.82
2980.75
2738.37
2980.45
620504.54
4848048.32
169.88
2855
3336
2862.55
3336.07
2854.51
3337.03
620519.95
4848002.25
169.96
3209
3218
3217.41
3218.14
3208.79
3219.29
620565.94
4848017.63
169.92
3092
2863
3099.65
2863.53
3090.62
2863.43
Building 5
620753.79
4847797.58
176.63
4795
1406
4793.49
1408.54
4794.11
1407.82
620675.77
4847771.87
176.59
4992
2008
4991.26
2013.39
4990.29
2007.80
620705.72
4847682.57
176.74
5682
1777
5683.18
1782.69
5680.77
1777.59
620783.60
4847708.69
176.61
5482
1178
5482.31
1179.05
5481.51
1178.80
620563.73
4847602.66
188.92
6306
2872
6304.02
2876.78
6307.17
2872.21