delaminating for the special construction management by the
time of modeling (method of special entity)to realize the target
of constituting database particularly. Also, it is possible to
constitute different unit modes on the base of floors.
It can be showed in a figure as follow:
As to database, which can be constituted according to different
needs and the only thing done is to choose the different
databases contacted so as to inquire reciprocally in practical
application.
3. REALIZATION OF MANAGEMENT-ORIENTED OF
3D MODELING
The research is carried through on the base of JX-3D, a 3D
virtue reality system soft developed by China Siwei Surveying
& Mapping Technology Company, which is operated by the
following major process.
Detail process is showed as follows:
(1) Open CAD file, the base map in CAD of Huaihai Institute of
Technology (HHIT) is showed, the process of MF-MIDout then
is load in CAD.
(2) Open the SupematureGIS, stick the option of transmitting
image of vein on the menu of editing, transmit the image of
HHIT collected under foot by JX4 into SupematureGIS, input
the geodetic coordinates, adjust the parameters of skimming.
(3) Transmit the data of house mode(a data of vector collected
by JX4—HHIT*.ASC ), load the data of house mode, transmit
the mode of house in HHIT—hhit*.house.
(4) Constitute TIN: create new rectangle in CAD, assign the
restraint of height between (0, 0, 0) and (0, 0, 5), reserve the file
of figure as file of dxf of 12 th edition. Read the file of dxf.
Obtain the file from the option of triangulation network of
terrain on the menu of file. Delete the construction elected in
the base map, Establish new construction figure in CAD. One
important point should be indicated: describing the rectangular
to a counterclockwise direction to choose the joint.
(5) Transmit the cvrc into CAD to edit the type of data, and
code the arc elected. Transmit outvr to gain the data of 3D, the
spatial model will be showed in the soft of Supemature.
However it is only the first floor, the second and the third floor
have to be erected on the base of the first floor. In view of the
outer figure of construction elected only is rectangular which is
so easy that the 10 th construction model will have to be chosen
when input the code of house. The value of height of the first
floor is the average value of dividing the practical height of the
whole construction into three equal parts. The new model,
which will divide one building into three parts and lead to the
change of the numbers of ID and database correlated, is
different from the former model.
Fig 3. Flow chart of management-oriented of 3D modelling
Build model by means of dividing the construction into several
parts: firstly, calculate the average value of height according to
the actual height of the construction and the number of floors
needed; Then, the major work for building the first floor is,
according to the ordinary method of modeling for a house, to
code 10 for the house, elect counterclockwise the culminations
of rectangle and return clockwise to constitute the roof in CAD
since the construction elected is a regular cuboid which leads to
return at the last culmination of bottom of the construction. The
height of the first floor should be entered into the model on the
base of the calculated mean value which indicates the 3D model
of the first floor can be showed in the 3D interface.
Next for the second floor. The process of operating is alike to
the first floor. Difference lies in the change of geographical
coordinates: the Z value of four culminations of the foot of the
build is as much as the double Z value of the first. Therefore,