-18-
The operating airport was Beira, 750 Kms away from the
head office in Lourengo Marques, and at a distance of 250 Kms from the
center of the area flown. This mission lasted 8 days which, owing to
the metereological conditions of the area, has to be considered rather
fortunate.
Although the films were developed in Lourenpo Marques a
small gap occurring between strips 1 and 2 could be reflown immediately
by cabling the geographical coordinates of the filling strip ends.
It must be said that the existing aerial photography 1/50.000
as well as the good references in the river simplified the execution
of the photo coverage very much. Thus, the low percentage of rejected
photography can be understood.
2.- OFFICE WORK
WORK
EXECUTION
UNITARY
STEPS OF THE WORK
TIME IN
TIME IN
STAGES
MAN-HOURS
MAN-HOURS
0
H >
Eh
ru
Index map l/lOO.OOO, drawn on millimetric paper
by pantographic reduction of the 1/50,000 map
series and containing only the hydrography,
roads and localities
31
0.17
Subdivision into mosaics and plotting of 274
19
k
■<
Ph
£3
control points on the index map (286 mosaics)
Ph
Identification and transfer of 210 control
1
points (out of 274) from the 1/50.000 photogra
phy into the 1/20.000 new photography
51
0.19
Selection and point transfer of the tie and
carry over points of 1.244 photographs
698
0.56
Preparating and cutting 1.244 templets
273
0.22
Eh
3
%
Construction of four 25 oms. grids (6 meters
long x 1 meter wide)
148
37.00
Trimming and assembling
341
. 0.27
l
P
r.n
Transfer of the slotted templet control, per
179
0.14
in
Eh
O
strips, onto transparent bands. (1.244 photos)
P
U1
Enlargement of the slotted templet control, in
the Wild E3, to the scale l/lO.OOO (1.244 pho
tographs)
314
0.25
-