the "Propos
°ying Ordin
rtical and
(e required
.arge scale
000 or lar
lions of fo
‘e usually |
irveys. The
" the four
shed by
dures basei
eld establi
models.
the horizo
ints would
riangulati(
quirements:
i
ll vary 2)
bani
cal control
endicular |
about 15
Airborne l|
ished by |
rol by Ter:
ar) signifi
erage,
rveyed coni
establishé
ques, and |
techniques
All horizd
ed in the
rcator Grid
Union of Soviet
Soc. Republics
4
16
x
- 70.
Ground Control Points.
Ad 5.1
Ad 5.23
Ad 5.1
system.
Central point is used occasionally.
nd
Adjusted to 2 order.
Traverse: 1:7 500 or 2,23? VL
L- traverse distance in
miles
Triangulation:
1:75 000 mean closure A =5??
max. A -10??
Levelling: 0,05? VL
L- length of the levelling line in
miles.
For maps 1:25 000 and 1:10 000 ho-
rizontal ground control points are
measured in 8 bases. The same for
vertical points on 1:25 000 and
1:10 000 and contour lines interval
5 and 10m (usually identical with
the horizontal ones). On the scales
1:25 000 and 1:10 000 and 2,5m -
contour lines the vertical points
are always determined in pairs in
4 bases.
For mapping on the scales 1:5 OOO
and 1:2 OOO the Instructions fix
the distance between ground control
points in 4-12 bases according to
the accuracy required. When mapping
on the scale 1:5 000 ana contour
lines interval lm and 2m and on
1:2 000 and interval 0,5 and lm each
stereopair must be secured by 4
elevation control points (basic).
When the interval is larger (2m on