Full text: Actes du onzième Congrès International de Photogrammétrie (fascicule 4)

   
the "Propos 
°ying Ordin 
rtical and 
(e required 
.arge scale 
000 or lar 
lions of fo 
‘e usually | 
irveys. The 
" the four 
shed by 
dures basei 
eld establi 
models. 
the horizo 
ints would 
riangulati( 
quirements: 
i 
ll vary 2) 
bani 
cal control 
endicular | 
about 15 
Airborne l| 
ished by | 
rol by Ter: 
ar) signifi 
erage, 
rveyed coni 
establishé 
ques, and | 
techniques 
All horizd 
ed in the 
rcator Grid 
Union of Soviet 
Soc. Republics 
4 
16 
x 
- 70. 
Ground Control Points. 
Ad 5.1 
Ad 5.23 
Ad 5.1 
system. 
Central point is used occasionally. 
nd 
Adjusted to 2 order. 
Traverse: 1:7 500 or 2,23? VL 
L- traverse distance in 
miles 
Triangulation: 
1:75 000 mean closure A =5?? 
max. A -10?? 
Levelling: 0,05? VL 
L- length of the levelling line in 
miles. 
For maps 1:25 000 and 1:10 000 ho- 
rizontal ground control points are 
measured in 8 bases. The same for 
vertical points on 1:25 000 and 
1:10 000 and contour lines interval 
5 and 10m (usually identical with 
the horizontal ones). On the scales 
1:25 000 and 1:10 000 and 2,5m - 
contour lines the vertical points 
are always determined in pairs in 
4 bases. 
For mapping on the scales 1:5 OOO 
and 1:2 OOO the Instructions fix 
the distance between ground control 
points in 4-12 bases according to 
the accuracy required. When mapping 
on the scale 1:5 000 ana contour 
lines interval lm and 2m and on 
1:2 000 and interval 0,5 and lm each 
stereopair must be secured by 4 
elevation control points (basic). 
When the interval is larger (2m on 
   
   
   
   
    
   
    
  
    
     
   
   
  
    
    
    
      
   
   
  
  
     
   
  
  
    
    
   
	        
Waiting...

Note to user

Dear user,

In response to current developments in the web technology used by the Goobi viewer, the software no longer supports your browser.

Please use one of the following browsers to display this page correctly.

Thank you.