Vm Um
a. Personnel
8 Officers
5] Airmen
1l Airmen
b. HIRAN Control Stations (See Figure 2)
Site #21
Site #22
Site #23
Site #24
Site #25
c. Weather Stations (See Figure 2)
PROJECT AF 67-4:
FIELD OPERATIONS (LIBERIA)
(1370th PMW)
(1370th PMW)
(Air Weather Service)
Foya Kamala
Nimba
Harbel
Tchien
Nuhon Point
No. 1 (near HIRAN Site #22
No. 2 (near HIRAN Site #25
d. (Ground Equipment
In operational use for the first time was the WS-430C Photomapping
and Data Reduction Facility. This 8-module air transportable system
was designed to handle geodetic data and aerial photography obtained
by the AN/USQ-28 aerial mapping system. Power for this facility was
provided by 2 150 kw generators, each weighing 12,000 pounds. Six of
the eight modules were installed at Camp Ramrod and were used through-
out the project.
1 Processing Lab ES-59A Equipped with a Versamat
1 Printing Lab ES-58B
1 Chemical Mix Lab ES-65A
1 Storage Shelter, FS-6A
1 Maintenance Shelter, FS-7A
1 Quality Control Lab ES-61B
These were:
11