46
error more than a specified percent of the total volume. This | As m
allowable error can be related to a R.M.S.E. of the DTM that usua;
will be used to generate the cross-sections or profiles. If | proi.
the DTM has been adequately tested, and it meets the specifi- | terre
cations, the engineer should be free to pursue the project with | The €
confidence that the terrain data being provided is adequate for
his needs. Ine i
which
The photogrammetrist, who will probably generate the DTM, know- conta
ing the limitations of his instrumentation, can specify the terra
kind of aerial photography he will need, specify the quality See F
and quantity of field control that is necessary, and design T
procedures that will assure him that the DTM product will meet The 1
the requirements. Think of the peace of mind that goes with one a
the product that meets a certain specification. is de
69
N HM—— EAST DIMENSION —— DATA POINTS
P
P
| i 4
ed
7]
DTM
| INTERPOLATED
| . POINTS
S
"A ;
=
LL
= > 3
= i | RTARTING
e : t INOORDINATE
FH
e .
© ‘
| .
! .
—-— DIST a N EU Mn OMAN DT ed SIZE OF
EAST LL de of Tr ndn we | BLOCK
: BLOCK
DIST. ETE ^ Fig 8.
NORTH
| Note t
i | E brough
ready i
É v The cl
Fig 7. Organization of Terrain Däta round ir
Stored.