Martin,J. and McClure,C.,1985. Diagramming Techniques
for Analysts and Programmers. Prentice-Hall Inc. Engle-
wood Cliffs, New Jersey.
McRae,S.D.,1989. GIS Design and the Questions Users
should be asking. GIS/LIS Proceedings, Orlando, Florida,
November 26'"-30"", vol.2,pp.528-537.
Mittra,S.S.,1988. Structured Techniques of System
Analysis, Design and Implementation. John Wiley and
Sons, New York.
Modha,J., Gwinnett,A. and Bruce,M.,1990. A Review of
Information Systems Development Methodology (ISDM)
Selection Techniques. OMEGA International Journal of
Management Science,vol. 18,No.5,pp.473-490.
Naumann,J. and Palvia,S.,1982. A Selection Model for
Systems Development Tools. MIS Quarterly / March, pp.39-
47.
Olle,T.W. et al.,1991. Information Systems Methodologies:
A Framework for Understanding (2nd.Ed.). Addison-
Wesley, England.
Paresi,C.,1991. Introduction to Information System
Development. ITC Lecture Notes Series.
Radwan,M.M.(Undated). Digital Mapping and Topographic
Databases. ITC Lecture notes.
Slooten,K. van.,1992. A Multi-Level Approach for the
Analysis and Design Process. Proceedings MOACSI,
Nonkes, Sept.
Stamper,R. and Kolkman,M.,1991. Problem Articulation:
A Sharp-Edged Soft Systems Approach.Journal of Applied
Information Systems,vol.18,pp.69-76.
Stamper,R.,1992. The Parallel Development of Laws and
their related Information Systems. University of Twente,
The Netherlands.
Ward,P.T.,1984. Systems Development Without Pain: A
User's Guide to Modelling Organisational Patterns. Yourdon
Press, New Jersey.
Yourdon,E.,1988. Managing the System Life Cycle. (2nd
Edition) Yourdon Press, New Jersey.
ABSTR
The u
e
N
I
N
w
6 AND 7 8 data
RATING OF | and €
CRITERIA tiona
(RCk) 2
No their
9 -- Propision advan
27 rec force
3 -- Good ]
4 -- V. Good videl
5 -- Ecxellent of th
012345 and ]
Cl Wi* RGI Major
C2 W1* RC2 datio
C3 W1* RC3
Ck W1* RCk mzzxxxxmm KEY W
Wp1 ‘
F2 wa infor
WEIGHTS
WEIGHTS
CONTINGENCY
= Rfi
Pn
) Rp
Pi
MODEL
) WPa*Rfi
Fi
F1
Total Weighted Rating
Per Meth. / Tech.
RT =
Wi * Rck
WEIGHTED RATING
Ck
Rü- ) wi*Rck
C1
Total Weighted Rating
(CRITERIA)
ACTIVITIES
Wp |& FUNCTIONS Wi
Object System Phases
Per Function (F1)
Per Phase
Total Weighted Rating
Rp =
F1 W1
DESIGN
F3 W3
Fi Wi
Wp2 In tl
the 1
Group
Produ
syste
discu
those
| refer
APPENDIX 1: The Evaluation Matrix per Methodology/Technique per Evaluator (for steps 0 through 8). Steps 4 and 5 | spati
are under Organisational Constraints. Of I
sensi
photo
produ
photo
terra
Likew
sense
Analy
thema
With
Syste
IMPLEMEN-
TATION
Wpa |
OPERA-
TIONS
266