* The WG will prepare two tutorials for
the ISPRS Commission II Symposium
in Ottawa; topics are: "GPS for
Photogrammetry and Aerial
Mapping”, and “Mobile Data
Collection for GIS”.
* A technical session will be organized
at the Workshop on High Precision
Navigation (Germany 1994/95).
e The WG will participate at a Joint
Workshop on “Computer Vision in
Photogrammetry” in Stuttgart,
Germany (8-10 November, 1995);
organized together with WGs 1/5 and
II/2- 5.
e WG will co-sponsor a Joint Workshop
with InterCommission WG II/III in
USA (1994/95)
e WG will organize a Joint Workshop
with WG III/I in Barcelona, Spain
(1995).
* The WG will actively participate at the
following conferences: Commission V
Symposium, Australia (April 1994),
Commission III Symposium, Germany
(September 1994).
WG II/2 - "Hardware and Software
Aspects of GIS"
by Chairman: Dr. Manfred Ehlers
(Germany)
Co-Chairman: Nickolas L. Faust (USA)
Secretary: David Steiner (Germany)
WG Members: 48
Terms of Reference
* design and operational aspects of the
integration of GIS with image analysis
systems
520
e studies of GIS characterized by
workstation, mainframe and
microstations in a heterogeneous
environment
e studies of parallel processors, array
processors, supercomputers and
optical hybrid systems for improving
GIS
* design and performance issues for 3-D
GIS
* studies of benchmark designs for
integrated GIS
* studies of man-machine interaction:
displays techniques, interactive
techniques and audio interaction
e hardware and software for
input/output aspects of GIS
e studies of GIS standardization as
applied to user interface, networking,
testing and databases
Accomplishments of Working Group II/2
The working group has accomplished the
following:
April 6, 1993 - Working Group Meeting at
the 25th International Symposium:
Remote Sensing and Global
Environmental Change. The Meeting was
attended by 19 participants and convened
by Manífred Ehlers, who gave a brief
introduction to the structure of ISPRS and
its working groups. A short description
of the other Commission II working
groups was presented. This was followed
by a description and explanation of WG
II/2's terms of reference.
Workshop
that the pl:
pushed in
time constr
hold the w
USA, howe
other sugge
Fish & Wil
in conjunc
scheduled
Johnston a
organizatio
Developin;
discussion
discussion
developing
considering
there (in p;
possibility
through the
connection.
indeed, a pc
number of
internet cor
obtaining f
sources sucl
foreign aid
volunteered
pursuing ch;
Newsletters
information
working gro
of the year
information
events as w
working gi
provided inf
of the ISPRS
and contac
Commission
newsletters
member lis
newsletters v
Workshop
planning f
upcoming W