79
120
100
80
60 —
20
0 T T T c T
n n In n Jn 3 7n n
8 4 3 2 3 4 8
Diagram 17. Ordinary aerial triangulation. Standard errors of the y-coordinates.
Bridging.” s, = 1.
neglected we will regard the weight number (323) as representative for
the error distribution of the y-coordinates of the strip after transforma-
tion to the system of the ground.
3.223. The elevations
We start with the expression (285) and with the two first terms.
For an arbitrary model p — 1,p we have in the center of the strip
i-p i-5
DH, = b X (p —$-r 1)dg, - 2 dbz; (325)
i=1 i=1
Since only three elevation control points are assumed to be available
in accordance with fig. 1 the errors of the elevation in the model »,» + 1
eg pH |
Fr en TETE
E I