Full text: Proceedings, XXth congress (Part 2)

tanbul 2004 
for planners 
om sectoral 
monitoring 
evelopment 
slopes and 
tion cover), 
the effect 
nd services 
€ factors or 
ate, and/or 
re, which is 
iral events, 
evelopment 
ig  lifeline 
r example, 
ulnerability 
reparedness 
s to be used 
classes are 
groups are 
The class 
boundaries, 
ince points, 
nd geology 
cale maps, 
| eic. 
iler, sewer 
hazardous 
laces, high 
rs, health, 
Temporary 
>r; disaster 
"elc. 
t inventory 
machines, 
quipments, 
taff in duty 
s that are 
(erosion, 
during and 
n the other 
ign on the 
on will be 
ble 3.2) 
International Archives of the Photogrammetry, Remote Sensing 
  
  
and Spatial Information Sciences, Vol XXXV, Part B2. Istanbul 2004 
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
Determination of radio stations, radios and broadcasts 
of security, rescue, first aid teams 
Planning of alternate 
transport 
transportation and public 
Planning of alternate seaports and harbours 
Determination of alternative railroad stations and 
vehicles 
Planning of alternate aerial transportation 
Determination of alternate fuel-oil stations 
Traffic Control Points 
  
Capacities of radio and 
broadcasting stations 
Highway lines, properties and 
instutions. 
Roads that needs to be held open 
Important bus lines 
Harbour, sea transportation, metro 
and railroad lines, aerial 
transportation vehicles, capacities 
and instutions of vehicles, 
  
=r 
Process Content Of Process Methodology Input for AFAYBIS Produced in AFAYBIS 
Spatial Earthquake. Flood. Fire, | Creation of simulations and | Possible risk areas and | Maps about hazardous 
determination Landslide, Storm, Diseases, | determination of risky areas | allocation of these areas areas. 
of risks Tsunami, Thunderbolt, | with GIS 
pollution, accidents, others 
Determination | Examination of public | Examination on the project or Risk zones determined 
of risks for | buildings, critical | at survey and deciding at the Buildings that need | after examination and 
buildings. institutions. houses and | office depending on zoning precautions geoprocessing of the 
other buildings. data 
x Electricity Examination on the project or | Technical Infrastructure 
. | Determination Water at survey and deciding at the | lines and — instutitons, Buildings, critical 
E | of risks for | Gas office depending on zoning transportation data, instutions and technical 
= infrastructures Sewers : infrastructures such as 
and lelecommunication Technical infrastructures | bridges tunnels etc. that 
transportation Transportation and transportation | needs precaution 
elements that needs 
strengthening 
Plans and permits Control New buildings and data 
Damage Education Criteria's Education Materials 
Mitigation Announcements 
Mitigation and | Suggestions, Notices Precautions that are | Reduced risk areas 
announcements of risks already been taken 
Table 3.1 Process’ before the disaster 
Tet Content Data Produced in AFAYBIS 
definition C 
Personnel, 
vehicle, Associations agreed to participate in with their | Alarm Level 
tools, personnel, vehicle, tools, supplies, etc Risk Zones 
supplies Service groups 
Shelters 
Waste disposal zones Criteria's 
Helicopter airlines sea lines, railroad transportation (depending on alarm zones and 
areas scenarios) Plan assignments and 
Supply depots, supply distribution points informing 
Sources (Building, Land usage, 
Morgues and burial zones human, tools, supply) Plan assignments depending 
Hospitals, portable hospitals, blood centres, | Content and location of protocols | on examination of 
ambulances with private sector Location + capacity + needs 
Buildings in which chemical, nuclear, biological, + average fullness ratios + 
explosive, flammable, materials are produced and | Properties lines and instutions of | alarm level 
sold technical infrastructures 
Public buildings that needs to be protected and 
secured Critical instutions that need 
Historical signs, banks, shopping centres electricity, water, gas, | Teams: Personnel, vehicles, 
communication. tools, supplies 
Planning of distribution of exterior aids 
Areas Alternate communication ways Communication power supplies. Team - location 
Location- technical 
substrucure —transportation 
Team - technical substrucure 
-transportation 
  
  
Table 3.2 Process’ during and after the disaster 
  
 
	        
Waiting...

Note to user

Dear user,

In response to current developments in the web technology used by the Goobi viewer, the software no longer supports your browser.

Please use one of the following browsers to display this page correctly.

Thank you.