bul 2004
sk the
ONOS
0 plan
ndows
nerate
JNOS
>cause
olatile
ensing
eature
asking
th the
g also
lagery
ed on
r data
or 60
[f the
r that
e for
nning
has
or the
sather
^ can
Zero
ation
round
de to
tL, the
|lite.
m is
it the
lite is
d on
CY.
, the
| the
ı ten
lite,
ed 1s
ately
d the
and
inks.
s the
lated
International Archives of the Photogrammetry, Remote Sensin g and Spatial Information Sciences, Vol XXXV, Part B2. Istanbul 2004
data to Base Image Recording, which records them
on disk arrays.
At the end of the contact with the satellite, the
serial data stored on the disk arrays are converted
into image files that are recorded on tapes and
telemetry files that are processed to create support
data elements that are stored in the database.
GPS Constellation
ue uei mo e Ar rein CL
GPS Link
=
Wideband Downlink
Narrowband Uplink
(Primary Frequency)
Narrowband Uplink —
(Backup Frequency) yn (320 Mbps)
Data Type
WBDL Image
Narrowban m are
Downlink Metadata
NBDI. Tasking
Response
NBUL asking
Instructions
Figure 2 . Uplink and Downlink
3 Hours before the pass an optimization is
performed for to be collected candidate image
regions by running the mission planning software
after which the collection plan is saved by
considering the weather forecast which is received
from weather forecast data provider company via
ftp.
2.4. Contact with IKONOS
2.4.1. Realtime mode :
10 minutes prior to contact ground station
equipment connected to the antenna are switched
to the real time mode. 3.5 minutes prior to contact
the antenna points to the location where the
satellite is expected to appear above the horizon in
program track mode. Upon contact satellite
authentication commands and collection plan are
sent within a 25 second window to the satellite.
At the start of the activity window, the ground
station RFT receives a narrowband (NB) signal
from the satellite. The ground station RFT is also
transmitting a NB to the satellite. If the high
powered amplifier (HPA) on the RFT is not active,
the satellite will not receive the signal. The
command status indicator goes from “Unlocked”
to "Locked" It indicates that the satellite's receiver
is "locked" onto the signal transmitted by the
ground station. Once the operator has verified that
681
the NB receiver on the satellite is working, the
ground station signal must be modulated and the
crypto signal and command sequence should be
sent to the satellite within 25 seconds. The satellite
maneuvering to the imaging place after onboard
software execute the tasking package, this
maneuvers called as slew maneuvers of the
satellite and the satellite cannot take any image
during that time since the actuators is returning the
satellite exact imaging place.
2.4.2. How to Satellite Process Collection :
Onboard software receives the commands and
processes them.Then it calculates the scan and
slew durations for an image region.Scan is the
actual collection time for an image region ,slew is
the waste time between the image regions.
Actually the satellite collects an image region
then it returns another image region so we called
this duration as slew.
While the satellite is collecting the image regions,
Image Data is sent to ground in realtime over a
320 Mbit/Sec link. This image data is saved along
with the metadata which is used for rough
coordinate assessment. Then the browse image is
subjected to cloud cover assesment. 24 hours later
the real satellite attitude information is sent from
(POC) and it is processed to have accurate
coordinate information for the image regions.
3 TOOLS FOR IMAGERY COLLECTION
3.1. Cloud Forecast
After getting 4 days cloud forecast information for
the whole communication cone from the
meteorological service provider the relevant
satellite pass is either requested, modified or
canceled from Primary Operations Center (POC)
depending on cloud cover. As you can see from
the Figure 3 Cloud Forecast Information, the
Cloud Cover data is sent by the national
meteorological institute for four days forth. The
display has grid lines with 10 degree and at the top
of the image there is a legend for the cloud
predictions information. Left column is related
with the prediction start time which is calculated
by the agency with compound several
meteorological data into the calculations and then
the software does some calculations with iterations
of the mathematical models. The right column has
this iteration for the related days cloud cover
information. For example the software was run on
Wednesday 13 August for the 18 August 2003