Full text: Proceedings, XXth congress (Part 3)

International Archives of the Photogrammetry, Remote Sensing and Spatial Information Sciences, Vol XXXV, Part B3. Istanbul 2004 
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
1234 
1.3 5 
55 432 1 
-1 7T 7T 53.1 
5 5 5 
7 7 7 -1 
Fig. 2: Multi-overlay at a 60% layout (top) vs. 80 % forward 
overlap (bottom). The number of frames and intersecting rays 
(top line) doubles, but the redundancy (i.e. 4 of observations — 3 
coordinates of the tie point, bottom line) increases by a factor of 
up to 7 times. 
4.4 Multi-Ray Matching for AT 
The positive impact of multiple overlapss becomes obvious 
when comparing the results from  aerotriangulation. We 
demonstrate this by a small strip with 11 images. The 
aerotriangulation was performed twice, once by excluding 
every second image and therefore reducing the overlap to 70 % 
(cf. Fig. 3a) and secondly by processing the triangulation for the 
entire data set resulting in a forward overlap of about 85 % (cf. 
Fig. 3b). 
  
  
  
Fig. 3a: Results from the aerotriangulation by MATCH-AT of 6 
images at about 70 % forward overlap (Project A). 
  
Fig. 3b: Results from the aerotriangulation by MATCH-AT of 
11 images at about 85 % forward overlap (Project B). 
  
Project A (6 images @ 70% forward overlap) 
Signe on, tL.65 pm 
Based on 
found 193 points connecting 2 photos 
found 344 points connecting 3 photos 
found 184 points connecting 4 photos 
Number of observations 4437 
Number of unknowns 2229 
Redundancy 2208 
Mean standard deviations of terrain points 
X ti 0.019 [meter] 
y t 0.025 [meter] 
z + 0.102 [meter] 
Tie Point z quality by 
Number of links/Standard deviation 
4 zZ +0,077 =- +0.060 [meter] 
3 z t0.158 - 10.082 [meter] 
2 z =:+0.287 - 40.160 [meter] 
  
Project B (11 images @ 85% forward overlap) 
Sigma oi... £1.75 pum 
Based on 
found 48 points connecting 2 photos 
found 80 points connecting 3 photos 
found 116 points connecting 4 photos 
found 160 points connecting 5 photos 
found 146 points connecting 6 photos 
found 173 points connecting 7 photos 
found 47 points connecting 8 photos 
Number of observations 8244 
Number of unknowns 2394 
Redundancy 5850 
Mean standard deviations of terrain points 
X t 0.016 [meter] 
y i 0.020 [meter] 
Z + 0.085 [meter] 
    
  
  
  
   
  
  
  
  
  
  
  
  
  
  
  
  
  
  
   
   
   
    
    
  
  
  
    
   
   
   
  
    
    
  
  
    
  
   
   
    
    
  
  
  
  
   
     
   
  
International Arc 
ee 
Tie Point z q 
Number of lin 
8 z 140,043 
+0.046 
2 +0.059 
z +0.065 
zg 40.052 
z E0110 
z 20.160 
Table 1: Sta 
The results of | 
overall geometric 
Proect A by a 
detected, when 
points. We show 
point could be m 
clear impact on 
deviation with 8 
images). 
42 Multi-ray N 
Based on a nov 
output of a DSM 
was processed an 
  
Fig. 5: Automa 
Result from 2 
rays (bottom) sh
	        
Waiting...

Note to user

Dear user,

In response to current developments in the web technology used by the Goobi viewer, the software no longer supports your browser.

Please use one of the following browsers to display this page correctly.

Thank you.