Full text: Proceedings, XXth congress (Part 7)

  
International Archives of the Photogrammetry, Remote Sensing and Spatial Information Sciences, Vol XXXV, Part B7. Istanbul 2004 
  
  
Figure 2. Land use change 
3.1 Under Controlling and Monitoring the Urban 
Development Areas 
Because of the continual growing of the constructions in the 
cities like a living organism, it is very difficult to under control 
of the developing areas in the cities with using the topographic 
maps, which are surveyed between the past and now, manually. 
In addition to, the topographic maps are not updated properly. 
Because of this, there is an urgent need to renew these maps for 
monitoring and under controlling the undesirable development 
areas in the cities. In order to work out this, the economic and 
politic supports are needed. The most disadvantages of the 
classic methods in the phase of the monitoring and controlling 
of the constructions are not to be flexible. In the process of 
time, it can be added one or more than one story to the current 
buildings or it can be built new constructions. That the 
determine those kind of buildings are very difficult with 
classical methods. But it is rather possible to determine these 
kinds of construction with suggested methods. With this 
methods the aerial photographs and satellite images are used. 
The municipalities using this method can obstruct the 
undesirable constructions in the developing areas. And than the 
cities are going to take the desirable urban construction and 
healthy views. So the controlling, monitoring and make a 
decision for developing the cities will be easy for 
municipalities. 
540 
Figure 3. Vector maps produced from aerial images 
4. DISCUSSION AND CONCLUSIONS 
To determine the necessary of using this suggested method 
these suggested criteria's must be taken into consideration. 
These criteria's are given follow. 
. The cities, which have the migration actions and undesirable 
constructions, 
. The cities, which have the industrial developments and tourist 
center, 
. The cities, which have the parcels of which owner is the state, 
etc. 
It has been very important to determine the period of the span 
time of taking the photographs and satellite images for 
monitoring and planning the urban developing areas. For 
determining this span time periods, some essential criteria's are 
given follows. These criteria's are; 
. Before and after the election, 
The periods for encouraging the people to do illegal 
constructions like making a law about these buildings in the 
public opinion, 
. Before and after the designing of the urban projects, which 
attract the people to settlements near this area, 
Outside of these three criteria, stated above, the span time of 
taking the photographs must be determined as one time in a 
year. The cause of this is checking the implementations results 
Inte 
of t 
dev 
this 
If tl 
by 1 
dec 
hav 
can 
can 
larg 
use 
fort 
orth 
Ref 
Dal 
Uni 
Kra 
Lar 
De 
OG 
Uz 
Üre 
Tez
	        
Waiting...

Note to user

Dear user,

In response to current developments in the web technology used by the Goobi viewer, the software no longer supports your browser.

Please use one of the following browsers to display this page correctly.

Thank you.