International Archives of the Photogrammetry, Remote Sensing and Spatial Information Sciences, Volume XXXIX-B7, 2012
XXII ISPRS Congress, 25 August — 01 September 2012, Melbourne, Australia
inverse Distance
Kriging
aigna
5 Myoerse Distance
Immer Distances
Figure 3. Troposperic Delays for ERS1/2 images (imaging time 16-17 September 1999 20:14). A) 16 September 1999 20:12
Tropospheric delays B) 17September 1999 20:12 Tropospheric delays C) 17-16 September 1999 20:12 delay differences
are show that the research can be useful for Turkey
conditions. SAR image processing is done by ROI-PAC
software. Images given by Dr. Cakır are belonging to 12-13
August 1999, 16-17 September 1999 with 157 track 797
frame number and 13 August 1999, 17 September 1999 with
157 track 815 frame number. Finally 2 pass interferograms
are produced from image pairs of ERS1/2. As expected
troposphere delay results are obtained again as in Cakır et. al
26
2003, which is also corrected by Meteorological data; NOAA
DMSP images acquired on 16 and 17 September 1999.
16-17 September tandems processed by us due to recognize
only the troposphere delays without seismic fringes on the
image.(Figure 4).