19
of
maximum by compensation for the earth rotation.
2. POLICY OF DEM GENERATION
We have had the following policies on DEM generation.
(1)DEM are generated operationally, if it is possible.
(2)GCP aren't utilized with a basis.
(3)Coarse DEM are utilized with a basis.
(4)DEM of 30 m grid are generated.
(5)DEM generation of Southeast Asia area is given high
priority.
By these policies, many relative DEM products will be
possibly generated. But some problems are caused.
(a)As ASTER is optical sensor, it is impossible to
generate DEM in cloud area, water area, etc. Therefore,
these area has to be detected automatically.
(b)For assure to quality of product, abnormal DEM data
that caused by mismatching have to be detected
automatically.
(c)The accuracy of elevation data depends on pointing
knowledge of spacecraft because GCP isn’t utilized.
Therefore, the performance of pointing knowledge had be
clear.
(d)Coarse DEM is desired one of high accuracy. As the
best DEM product is DTED made by Defense Mapping
Agency of USA, it isn't available. So, next better product
is GLOBE product or DCW product. As the GLOBE
product is 1Km Grid data. GLOBE will be selected as
coarse DEM.
3. The ALGORITHM
The general flow chart shows in figure 1 and figure 2.
This algorithm will be implement in ASTER Ground Data
System.
: ( Cloud Coverage Tabig (vNIRaN,3B Level1A Data )
Cloud&Water area
Extraction
(Cloud & Water Flag = DEM Generation
EF | (Stereo Matching) [=
DEM Browse | [“ApnormalValue] v
Generation | Extraction |
D | C (DEM Browse ) : (Abnornal Value Fg) | |
| | I^. 7
eem DEM X,Y,Z Set —
Correlation V.
Distance between :
Coefficient 7:
2 sight vector
DEM X,Y,Z
Data
Figure 1 General Flow Chart (1)
875
(Dem X,Y. set) (Catalog 7» = (CGCP Data
°° If there are GCPs
Z data Conversion
| Z data Conversion &|
‘| Correction
DEM Z Set
Bias Corrected
DEM Absolute DEM
using a few GCP using some GCP
South East Asia
DEM DB
| Specified products
p p
S _
Figure 2 General Flow Chart (2)
We adopted the stereo matching method using area
correlation technique. In a search of correspondence
point, We utilized stereo matching method on three
stages. Because it was a purpose that process time is
saved and mismatching is reduced. So, First
correspondence of tie point is examined using SSDA
method. Second and Third correspondence is examined
using correlation method.
If GCP are available, Bias corrected DEM and absolute
DEM are able to be generated. But GCP had to be
prepared by not system administrator but user. Their DEM
are treated as specific product.
4. ASTER DEM PRODUCT
Two kinds of DEM products will be distributed.
(1)XYZ set product
(2)Z set product
XYZ set product is the Data Set that consisted of relative
elevation data, correlation value and quality flags.
The elevation is calculated by stereo matching, and the
coordinate system is thing of earth fixation coordinate
system. Therefore, it isn't grid data but random data.
The quality flags are the index data which are indicated
the area where elevation was abnormal, matching
impossibility area.
The correlation value is also one of quality index. If
correlation value is low, probability that mismatching is
occurred is high.
XYZ set DEM will be generated 30sets per day.
Z set product consists of only elevation data made from
XYZ set DEM.
It is grid data converted into map projection such as UTM,
International Archives of Photogrammetry and Remote Sensing. Vol. XXXI, Part B4. Vienna 1996