5. Conclusion
With the object of streamlining the execution of work of
substation plant, a system has been built up which backs
up the measurement work of the base plate position for
installing the equipment . As the result of an error which
might occur in the measurement work having been
decreased with automation of the work reading the
design value of the base position and the work preparing
a document based on the measurement results, a
prospect has been gained that the work time in the
conventional hand work can be reduced greatly.
Since this measurement work is a work in which lots of
bases having the same shape are measured repeatedly,
it is suitable for automation. After this, it is scheduled to
examine an automatic measuring method with image
sensing.
252
KEYWORE
ABSTRACT
A low cost d
scale and civ
stable bar an
the system c
between the :
the cameras,
3D surface d
Since small-
metrists' att
evolved high
output. The i
greater accur
the camera s
control targe
integrating o
applying fun
and fast desc
possible with
GPS/INS sy
photogramme
orientation |
controls (Sch
and the meth
digital close
research focu
applications.
mapping of
construction
conventional
intrinsic ince
integrates the
and image pre
Using such a
determine th
process is re
approach is th
After briefly
self-calibratio
quoted direct
stereopair ar
configuration