Full text: International cooperation and technology transfer

19 
precision when using 
using more stations and 
rom our point of view, 
ince it is too difficult to 
m different stations, 
ndant measurements or 
the antenna for control 
ual adjustment, 
and the orientation of 
>n surveying from one 
of the co-ordinates 
each station in respect 
ocal network of all 
shown in the figure 
: range of 10 cm. 
ation and intersection 
sted as a minimum 
s local GPS station, 
en arbitrarily and thus, 
loice. 
are the calculated co- 
he calculated antennae 
ted one in the detailed 
s differences in the co 
large, and they could 
Fig. 9 - Graphical representation of the co-ordinate differences between 
MDL measurement and the combined one. 
Tab. 4 - the differences between the given co-ordinates of antennae frame center 
and the calculated co-ordinates, where the co-ordinates and rms are in meter. 
Differences of co-ordinates in the Italian National System (G.B) 
Site 
N 
rms* 
E 
rms 
H 
rms 
dn (m) 
de (m) 
dh (m) 
Bo-ASST 
4930092.3 
0.08 
1686579.9 
0.08 
77.1 
0.1 
-55.9 
5.8 
-3.2 
UNICOPER 
4931623.1 
0.07 
1687752.1 
0.07 
85.3 
0.1 
-8.4 
71.6 
7.5 
STADIO 
4929506.2 
0.08 
1683981.2 
0.08 
53.7 
0.1 
-71.5 
87.4 
-1.3 
BO- CENTRO 
4929691.4 
0.08 
1686368.2 
0.08 
113.0 
0.1 
10.5 
-64.6 
-3.6 
GRIZZANA 
4903445.8 
0.12 
1672095.1 
0.12 
683.3 
0.15 
-56.9 
2.3 
// 
* the rms include the errors in transformation parameters 
Tab. 5 - The differences between the given orientation of the antenna panels in 
the detailed drawing and the calculated one 
structure 
given 
Calculated * 
Diff. 
BO- ASST 
60 
73° 15’+- 32’ 
13° 15’ 
180 
182° 30’+- 16’ 
2° 30’ 
300 
309° 12’ +- 40’ 
9° 12’ 
UNICOPER 
60 
III 
// 
180 
III 
// 
300 
318° 32’ +-4’ 
18° 32’ 
STADIO 
60 
III 
// 
180 
197° 50’ +- 8’ 
17° 50’ 
300 
296° 09’ +- 8’ 
-4° 51’ 
GRIZZANA 
60 
67° 45’ +- 6’ 
7° 45’ 
180 
165° 15’ +-4’ 
-14° 45’ 
300 
264° 6’ 
35° 54’ 
Bo-Centro 
104° 
108°18’ 
4° 18’ 
194° 
198°18’ 
4° 18’ 
284° 
oo 
r—< 
O 
CO 
oo 
<N 
4° 18’ 
* the rms related to the adjusted redundant measurements.
	        
Waiting...

Note to user

Dear user,

In response to current developments in the web technology used by the Goobi viewer, the software no longer supports your browser.

Please use one of the following browsers to display this page correctly.

Thank you.