The International Archives of the Photogrammetry, Remote Sensing and Spatial Information Sciences. Vol. XXXVII. Part Bl. Beijing 2008
1340
No.
Scheme
Control
Points No.
Check
Points
Description
1
0C-16K
No
All
16poi
nts
16 checkpoints
2
16C-0K
All
16points
No
16 Control points
3
4C-
12K.1
01,07,
09,15
Other
12
points
Four comer points as
control points, and
other 12 points as
check points
4
4C-
12K.2
02,08,
10,16
Other
12
points
Four side points as
control points, and
other 12 points as
check points
5
4C-
12K.3
03,06,
11,13
Other
12
points
Four center points as
control points, and
other 12 points as
check points
6
12C-
4K.1
02,03,04,
05,06,08,
10,11,12,
13,14,16
01,07,
09,15
Four comer points as
check points, and
other 12 points as
control points
7
12C-
4K.2
01,03,04,
05,06,07,
09,11,12,
13,14,15
02,08,
10,16
Four side points as
check points, and
other 12 points as
control points
8
12C-
4K.3
01,02,04,
05,07,08,
09,10,11,
12,14,16
03,06,
11,13
Four center points as
check points, and
other 12 points as
control points
9
8C-8K.1
01,07,09,
15,03,06,
11,13
Other
8
points
Four comer points
and four center
points as control
points, and other 8
points as check
points
10
8C-8K.2
02,04,05,
08,10,12,
14,16
Other
8
points
Four line points and
four center points as
control points, and
other 8 points as
check points
Table 2. GCPs and Check points number and distribution
schemes
Figure 3. 1:50,000 topographic map (partial)
Figure 4. 12.5-meter DEM (partial)
Figure 5. 2.5-meter Ortho-Image (partial)
3.3 Experiment Results
The results of different number and distribution of control
points( table 3) show that: without ground control (16 check
points) the planimetry and height accuracy of CARTOSAT-1
stereo mapping is about 70-meter; using 16 control points the
planimetry and height accuracy reach 5-meter; the accuracy of
4 comer GCPs and 4 side GCPs is slightly better than 4 center
GCPs; the accuracy is becoming stable when using more GCPs;
in general the planimetry and height accuracy of CARTOSAT-1
stereo mapping could reach 5-meter using high accurate ground
control points.
No
Scheme
Control Points
Check Points
Nor
East
Hei
Nor
East
Hei
th
ght
th
ght
1
0C-16K
72.6
44.8
74.6
2
16C-0K
2.7
2.9
2.1
3
4C-12K.1
2.4
2.6
1.4
3.2
3.0
3.3
4
4C-12K.2
2.9
4.0
2.4
2.2
2.0
1.7
5
4C-12K.3
1.1
1.8
0.4
2.2
4.5
3.8
6
12C-4K.1
2.7
3.0
1.8
2.4
3.6
3.2
7
12C-4K.2
2.9
2.9
2.2
2.3
3.2
2
8
12C-4K.3
3.0
3.2
2.1
2.1
1.3
2.4
9
8C-8K.1
3.1
3.3
2
2.4
2.6
2.3
10
8C-8K.2
2.1
2.3
2.2
3.4
3.5
2.1
Unit: meter