ho
00
TABLE 2.
—
Country
¡3 cp
Publication _o £
Scale g ®
OhÜ
Type of Terrain
Field Work
%
Prepara
tory work
%
Detail
plotting
%
Total time
and cost per
km 2
$
Remarks
Belgium
1 : 25000
5 m
2.5 m
lm
slope 10%
slope 10%
slope 2%
varying
negli
gible
86%
finishing
14%
18.6 h
1800 Fr. B
36
field
work not
included
Belgian
Congo
1 : 20000
5 m
2.5 m
slope 10%
slope 10%
aerial triangu
lation
11% to
17%
71%, 67%
finishing
18%-16%
10.7h to
17.8 h
1.050 to
1700 Fr. B
34
1 : 200000
25 m
aerial triangu
lation
interpretations
47%
5%
31%
finishing
17%
1.25 h
130 Fr. B
2.6
1 : 500000
150 m
radial triang.
interpret.
40%
mosaic &
drawing
60%
0.5 h
15 Fr. B
0.30
Canada
1 : 25000
1 : 50000
1 : 200000
7.5 m
7.5 m
15 m
30 m
60 m
150 m
Rolling
Rolling
Mountainous
Rolling
Mountainous
30%
35%
30%
35%
30%
20%
15%
10 %
10%
10%
50%
50%
60%
55%
60%
24 $
5 $
9-10.5 $
7 $
3 $
24
5
9-10.5
7
3
Chile
1 : 25000
1 : 50000
20 m
50 m
Rolling
difficult
20%
20%
40%
40%
40%
40%
2 h
600 $
1 h 20 m
400 $
600
400
England
(private
Comp).
1 : 20000
1 : 25000
1 : 50000
20 m
5 m
10 m
Mountainous
Undulating
Flat
30%
40%
33%
5
5
5
65
55
62
5 h 10 h
5 h 10 h
1 h 2 h
—
France
1 : 20000
5 m
Rolling
27%
(aerial triangu
lation included)
72*
2.9 h
5.0 h
—
* with
drawing
and
finish
ing
North
Africa
1 : 40000
10 m
20 m
Rolling
29
71
1.25 h
2.0 h
—
Israel
1 : 20000
1 : 50000
10 m
20 m
Average
Average
40%
30%
5
5
55
65
50 — 70 $
35 — 45 $
50—70
35—45
Norway
1 : 25000
1 : 50000
10 m
5 m
30 m
20 m
Average
Mountainous
62%
74%
17
9
21
17
133 Kr.
34 Kr.
9,5 $
2.4 $
Pakistan
1 : 25000
7.5 m
Undulating
36%
—
64
81 Rs.
12$
Sweden
1 : 50000
5 m
15.7
70
112 Kr.
5.8 $
Cost of
support
ing
“econom
ic map”
not
included
Switzer
land
1 : 25000
20 m
Mountainous
20
4
finish
ing
55
9
—
—
NO
O