very well control the work of a group of four to six 
operators» possibly ladies» by doing the orientation and 
carrying out the periodical accuracy and other checks* 
This WL11 immediately increase the production potential 
with a nominal expenditure of time and cost for training* 
Trained and qualified operators could be the first line 
supervisors» under the overall control of fully 
qualified post graduate personnel* 
To achieve this situation» a careful interfacing of 
the existing system of education with the proposed Standard 
Set of Syllabii must be worked out for each country* Chly 
then can optimum results be obtained in the shortest 
possible time*