Full text: Special UNISPACE III volume

International Archives of Photogrammetry and Remote Sensing. Voi. XXXII Part 7C2, UNISPACE ID, Vienna, 1999 
161 
1SPRS 
UNISPA CE III - ISPRS/NA SA Seminar on 
“Environment and Remote Sensing for Sustainable De\>elopment” 
9:00 am -12:00 pm, 23 July 1999, VIC Room A 
Vienna, Austria 
Sensors 
Number 
of Bands 
Spectral 
Coverage 
Inm] 
Band 
Width 
IFOV 
(mrad)/m* 
FOV 
(km*) 
Radiom. 
Resolution 
[bit] 
Data 
Prod. 
State 
Of 
Art 
HRC-P 
Panclir. 
450+650 
- 
0.2/1* 
45/4* 
12 
Frame 
4096x4096 
pixels 
Sample 
VS-VIS 
1024 
max 
250+850 
0.6 
08/4* 
45/4* 
16 
Image 
Cube 
Sample 
VS-NIR 
450 
max 
850+2200 
3 
3/12.5* 
45/4* 
16 
Image 
Cube 
Investiga 
tion 
VS-MIR 
32 
max 
2500+ 
5000 
75 
3/12.5* 
45/4* 
16 
Image 
Cube 
Investiga 
tion® 
* FLIGHT HEIGHT H=5000m 
Table 1. MOSAM-SYSTEM PARAMETERS 
Block 5 is the Management Interface of the system realised on 
IEEE-1394 with 200/400 Mbit/s transfer rate. 
Block 6 is based on Silicon Graphics platfonn. 
Block 7 - Mission Control is the interface to Block 8 - Service 
Navigation systems for receiving online the GPS and the 
navigation control data. 
The modular organization of the system architecture allows 
independent tests, calibration and performance of the different 
sensors and gives full flexibility for different modes of operation 
of the system according to the different applications. 
4. PRELIMINARY STUDIES AND EXPERIMENTS, 
PROCESSING AND ANALYSIS OF RESULTS 
In order to specify and optimise the parameters and the 
characteristics of the system a plan was worked out for 
preliminary activities and experiments, which have to confirm 
the justification of the selected architecture of the system and to 
provide preliminary estimates on the possibility of solving the 
defined tasks. 
The main parameters of this programme are: 
- selection of typical areas for study of performance: 
- preliminary preparation and collection of additional 
information; 
- tests on board of an AN-30 aircraft of the panchromatic CCD 
camera TC217 prototype; 
- tests on board of an AN-30 aircraft of the video-spectrometer 
prototype for the visible range (VS-Vis512); 
- Ground-based tests with FPA (Focal Plane Array) camera for 
VS-MIR spectrometer (range 3-5 pm); 
4.1 Selection of geographical areas 
In agreement with the tasks mentioned in section 2.1 and after 
detailed preliminary analysis and discussions with colleagues 
from the Environmental protection chair of the Biological 
Faculty of the Sofia University and from the Laboratory on 
remote sensing applications in geology' of the Geology and Ore 
Exploration chair of the Mining Geological University of Sofia, 
two geographical sites were defined on the Bulgarian territory,
	        
Waiting...

Note to user

Dear user,

In response to current developments in the web technology used by the Goobi viewer, the software no longer supports your browser.

Please use one of the following browsers to display this page correctly.

Thank you.