MEASUREMENT OF LOOSENESS OF TIE BOLTS ON THE RAILWAY WITH LINE SENSOR CAMERA SYSTEM
Yoshitaka Matsumoto
CORE Co. Ltd.
3-4-15-903 Mita , Minato-ku , Tokyo , 108 , Japan
TEL: +81-3-3456-1911 FAX: +81-3-3453-4167
Osamu Murakami
CORE Co. Ltd.
3-4-15-903 Mita , Minato-ku , Tokyo , 108 , Japan
TEL: 481-3-3456-1911 FAX: +81-3-3453-4167
Masaya Nakagawa
Technical Center, East Japan Railway Company
2-1-19 Hiro-machi , Shinagawa-ku , Tokyo , 104 , Japan
TEL: +81-3-5709-3665 FAX: +81-3-5709-3666
KEY WORDS: Line Sensor Camera , Railway maintenance , Measurement by camera
ABSTRACT:
For Railway camary , the maintenance of the railway tracks is ane of the most important subject to keep
safe transportation. Especially , the railway tracks of the Sinkansen requires to pay much attertion
for the maintenarce by it’s high speed traffics. At present , mest of mainterance for railway tracks
are done by human's patrolling on foot , and it's difficult to detect wrong parts immediately.
Under this circumstance , it is reguired to researching the detection method of the loosen tie bolts and
springs on the railway tracks from photo or motion images . Recently , some effective results , to
measure the looseness of the tie bolts and springs on the Shinkansen slab tracks from their images which
were recorded by the Line Sensor Camera system , were acquired .
This paper introduce the detail of the measuring system's constitution , and the method of how to measure
the looseness of a tie bolt with the line sensor camera system.
1. BACKGROUND
Measureing line
Track inspection can be roughly classified into the Rui m
track irregularity and the track material. It had been
developed that the synthetically high-speed track
recording car for inspection of the track irregularity
in automatically.
Tie Bolt
However , for the case of inspection of the track
materials most of their inspections are still done by
human eyes walking cn the railway tracks , because those
are consisted on many items (Figure 1) , except for very
few case like as the joint gap measurement system with
image processing technology or the rail detector car
with supersonic waves.
Tio Plato 2mm fram Tie Plate Edge
It is impossible to inspect the railway tracks in the Figure 1. Structure of the Railway
daytime by high speed traffics of the Sinkansen. tying units
Therefore , the inspection should be done in the night
after passed the last train . And also, patralling on
foot consumes too much time and manpower . By the
reason of these , it is required to researching the
method to detect to the loosen rail fastening unit ,
consisted on a tie bolt and a spring , on the railway
tracks from photo images or motion images of them.