S prepared
re of CRC
Slovenia,
it different
e centrally
ctors. The
al offices,
connected
ce.
f Building
one on the
data basis,
hg parts.
buildings:
v ZPPLPS
uest of the
ettlements,
ids)
, Scanned
000)
electricity
ie building
vill get the
yutlines
a building
ding part
rt
- . Owner or a potential owner of a building part
- Administrator of a part of a building if state-owned
- Actual use of a building part
- Number of floors in the building
- . Connection with land cadastre (number of a parcel on
or under which a building is set, or a parcel on which
is building functionally linked)
- . Connection with the Register of Spatial Units (house
number when defined)
- . Year of construction of building
- Year of last renovation of a building and a building
part
- [Installations in a building (gas, telephone, cable TV,
water, electricity...),
- . Construction material of a building
- . Number of rooms in a building part (apartment)
- Information whether a building part has a kitchen, a
bathroom, and a toilet.
All records are presented together with the information about
the completeness and reliability.
2.4 Workflow
Work is organised on the unit of a cadastral community.
We can divide stages of workflow on:
- First preliminary treatment of data (preparation of
central register for data)
- Preparation of data: merging photogrammetricaly
acquired building outlines (connecting jutting roofs
with main building)
- . Automatic determination of type of the building
- . Central automatic determination of different kinds of
attributes which can be deduced out of several input
sources
- First phase at regional office: determination of
attributes which are connected to a building
- | Second phase at regional office: determination of
attributes which are connected to a part of a building
- Final merging and final inner control, adding data
from assisting input data sources.
Figure 4. Connecting jutting roofs with main building — we get
just one outline of the building
At the first and second phase of work at regional offices the
work is closely connected with good local knowledge. The
person who works at regional office has to check the automatic
determination of different kinds of attributes and establish those
not determined automatically.
The data are saved centrally and are refreshed simultaneously
with work, so there is no problem between different cadastral
communities on which the work process is simultaneous.
245
x
v
v
*
x
*
v
v
+
+
vic
*
WU SS
ET S Prek "m |
a
Figure 5. poires environment for he “Setup of Bulldıng
Cadastre — Registry Data"
3. DATA QUALITY CONTROL
3.1 Data quality control by the contractors
The contractors carry out inner control of the data quality. Data
quality is regulated by operative instructions written in the
public official invitation for tenders. When the work on the
cadastral community is finished, and inner data quality control
is finished, the cadastral community goes in the data quality
control by the SMA.
3.2 Data quality control by the SMA
The data quality control carried out at SMA is performed on at
least 5 % sample of buildings in cadastral community. If the
cadastral community has less than 500 buildings, the control
sample is bigger. Data quality control is divided in two parts:
contents control and systematic control.
Data quality control by SMA is performed at the local SMA
offices (12 centres) and is based upon a controller with good
local knowledge of the area (Operative instructions for data
quality control by SMA, 2003).
4. FIRST LAYOUT OF DATA TO THE POTENTIAL
OWNERS
After the end of the project the “Setup of Building Cadastre -
Registry Data", project “The First Layout of Data to the
Potential Owners” is planed. With this procedure the potential
owners of buildings and a building parts will have a possibility
to rectify different kinds of data in the register part of the
building cadastre (not all data).
At the moment “The Pilot Project of the First Layout of Data to
the Potential Owners” is being carried out at Geodetic Institute
of Slovenia. Its main tasks are:
- Preparation of the methodology of the project
- Finding out the conditions which will make this
project possible and have to be regulated with
different new laws (e.g. the taxation law)
- A Finding out different possibilities how to inform the
public about *The First Layout of Data to the
Potential Owners"
- . Ona test sample: testing the response of the potential
owners to the information letters, which will inform
them on the possibility to improve registry data.