Full text: New perspectives to save cultural heritage

CIPA 2003 XIX th International Symposium, 30 September - 04 October, 2003, Antalya, Turkey 
627 
curred in the 
ormations of 
;ion of steel 
iy) and stone 
ions. 
lents of the 
penings; 
ns utilizing a 
the building 
:ondition of 
acteristics of 
•ies of tests. 
lcluding an 
constructions 
idition of the 
isatisfactory, 
ensure the 
stored or re- 
t completion 
>, liquidation 
¡cted in order 
and subsoil 
/arious toxic 
al and man- 
id: 
d risk; 
condition of 
onment and 
against any 
ir capacity to 
changes of 
le course of 
the site; 
lvironmental 
naintenance, 
nt; 
) a program 
if a local 
nations was 
nd technical 
ate Outdoor 
ch survived 
orations, 
he twentieth 
re conducted 
construction, 
>n works in 
a conclusion 
: conducting 
of complex scientific-research works with the account of 
requirements for the World Heritage monuments which the 
Church is a part of. 
In the framework of “The Program for restoration works at 
architectural monuments of the State Outdoor Museum 
Kolomenskoye” for 2000-2004, Specialized company KREAL 
in 2001 commenced and still continues completion of complex 
engineering-technical examination of the Church building under 
an assignment of the General Contractor (CNRPM), utilizing 
modern methods and means involving mainly non-interfering 
technologies. 
The works are conducted under a program agreed with a 
Division named “Architectural monuments” of the Federal 
Scientific-Methodological Council for the protection of the 
cultural heritage of the Ministry of Culture of the Russian 
Federation. 
The program includes: 
• Engineering-geodesic (measurement) works 
• Examination of basements and foundations 
• Examination of constructions. 
In the result of engineering-geodesic works performed in an 
electronic form the following was completed: floor plans on 
various heights, facades, and cross-sections. A situational plan 
of the land plot was performed. 
Obtained materials allowed constructing a three-dimensional 
model of the church and they will serve as grounds for the 
restoration and recovery project. 
Received materials allowed us to construct a three-dimensional 
model of the church and will be used as the basis of the project 
for restoration and recovery works. Such three-dimensional 
model in addition to external and internal sizes includes all 
information available about the site (construction elements, 
defects, cracks, geological composition of the underlying 
subsoil). Such three-dimensional modeling has a number of 
major advantages: 
firstly, it is a fullest and compact description of the examined 
site, secondly, it allows us to fix, or, if we may say so, clone the 
site. A solid model makes it possible to obtain any sections and 
cross-sections and perform any measurements. As a result, we 
have an electronic copy of the examined site, which 
encompasses the fullest information about the site at the time of 
its examination. 
Analysis of already obtained examination results related to the 
examination of the basement and foundation allow to conclude 
that the relief of the plot has a significant slope in the 
direction of the Moskva River, to the east of the building the 
slope was artificially planned. The slope of the Moskva River 
around the Church of Ascent is characterized as stable from the 
point of view of landslides. Until 1980 there existed slight 
erosion due to the closeness of the river. In 1980 - 1983 the 
river bank was re-enforced. 
The basement of the main tall part of the building and carousel 
columns complete a unified platform faced with masonry 
utilizing a limestone solution (dimensions 24,5x27,2 meters). 
The foundation under the walls of the western part of the 
overlapping foundation and foundations of the porches are strip 
footing. 
The upper part of the foundation platform is made of limestone 
that was roughly cut using a limestone solution, and its lower 
part is made of broken limestone using a limestone solution 
filled with crashed stone and crashed brick. 
It must be noted that for the first time in the history of studying 
a monument a constructive solution of the foundation was 
disclosed. The foundation platform has a close to a wedge- 
shaped form, the capacity of the platform increases in the 
western direction, and it is placed in the depth of 4 to 7 meters. 
We may suppose that such construction of the platform was 
used in order to prevent from the slide of the foundation down 
the slope in the direction of the Moskva River. 
Under the foundation platform IGIT LLC disclosed a pile field 
of wooden piles made in the form of logs, semi-logs and 
squared beams with a diameter of about 18 cm and 0,80 -1,15 
meters long placed within a distance of 0,3 - 0,4 meters. The 
piles have a different degree of rot. Some of them are almost 
completely rotten and there are empty spaces on the place where 
they were installed that are called “glasses”. 
Subsoil “foundation” waters were encountered during the 
working two prospective shafts 4,07 - 7,00 meters under the 
ground from the upper surface of the blind areas. Reservoir 
material for them is the rubble laying of the foundation platform 
of the building through which rain waters are filtered. The 
waterproof barriers for them are loams of moraine of the Dnepr 
ice-formation. The chemical composition of encountered waters 
includes hydro-carbonate-calcium type saturated with ions of 
free carbonic acid, which proves that there is a filtration of 
water through the laying of the foundation platform. 
A minimal meaning of the calculated resistance of the soil was 
observed the zone of the strip footing foundation of the western 
porch, and maximum meanings - in the zone of the deepest part 
of the foundation platform. 
Visual examination of the on-the-ground part of the church 
disclosed the following: 
Split-off of the masonry of the overlapping foundation resulting 
in internal vertical cracks of up to 10 mm; tear-off of internal 
pilasters of the western overlapping foundation walls and 
broken tie-up bricks and occasional insignificant vertical shift of 
split-off masonry lines; sloping cracks in side walls of the 
western overlapping foundation, proving the uneven setting of 
the foundation platform of the central part and the strip footing 
foundation of the western wing of the church; vertical through 
cracks dividing the church building in the medium-tall zone into 
four practically unrelated parts; a vertical crack (scale-off) of 
the external wall of chamber of the inter-wall stairs; broken 
metallic links under the galleries and along the perimeter of the 
church walls at level of the lower part of kokoshniks, and their 
complete loss in the western overlapping foundation; layer-type 
corrosion of interlinks in the central part of the overlapping 
foundation wherein a layer is 15 mm thick; cracks on the lower 
surface of the gallery arches and in the zones of stripping of 
formwork of the ceiling arch of the western overlapping 
foundation; split-off of the masonry, especially in the locks, 
arches of the western and central overlapping foundation that is 
50 mm deep, and in specific parts - up to 150 mm; defects of 
the plaster layer and weathering of the masonry of the external 
walls. 
Geophysical examinations allowed to see a significantly uneven 
masonry (the speed of lengthwise waves in the course of X- 
raying reduces two to five times). 
Resistance-related characteristics of the brickwork based on the 
test results vary from 40 to 60 kilos/cM2. 
The Chemical analysis of the links made of steel showed that 
the links are made of practically pure steel. 
The mechanical boring of the wall masonry in the zones with 
abnormally low speed of distribution of lengthwise waves as 
determined in accordance with the results of geophysical 
examinations showed that the visually observed in the window- 
frames split-off of the wall masonry goes through practically all 
the wall masonry of the western overlapping foundation, and 
such split-off exists both from the internal and external part of 
the wall at a depth of up to 450 mm; at the places of split-off in 
vertical seams of the masonry the solution has lost its structure, 
the connection of the solution with the brick is broken; at a 
depth of over 450 mm from the external and internal surfaces of
	        
Waiting...