115
Attempts at taking photos in the spring season have not
brought forth such good results and the period of time in
which it is possible to take good photos is limited to
a couple of scattered days.
- the necessity of using the services of a co-member - in the
period of taking of the photographs and photo- chemical
treatment does not permit the start of basic work for up to
a 5 month period. During this time we carry out work with
the photogrammetric groundwork.
- winter - directly follows after the reception of photographic
material. In the region of southern Poland the snowy winter
makes work impossible for 4-5 months.
- production capability of equipment in autogrammetrieal analyst
and applyed usefullness of a suitable amount of equipment
in basic measurements /for groundwork/.
For realization of the presented production cycle the firm
makes use of the following equipment;
- for basic photogrammetrical measurement - 2 range-finder
- sets - firm WILD Di-3 and Di-10
- set of 3 autographs - firm WILD A-8
- stecometr - firm Zeiss for observation of elements of
aerotriangulation
- computation performed on Odra 1204
- full equipment for field units basic materials for field work
- 19 terrain vehicles
as Well as the following personnel, subdivided into groups
working in various stages.
Stage
of production
composi
tion
of
teams
number
of
teams
time
period
months
amount
labor
consumpti on
in work/months
eng.
tech.
aux.
eng.
tech.
aux.
1• Preparatory
work
2 eng.
1 tech.
1
24
2 *
1
48
24
nm
2. Photogrammetric
groundwork
2 eng.
2 tech.
8 auxil.
2 vehicl*
1
12
2
2
8
24
24
96
4a. Autogrammetri
cal analysis
3-autographs
16 h.day
1-stecometr
2 eng.
2 tech.
6
7,5
6
6
-
45
45
-
2 eng.
1
6,5
2
-
-
13
-
-
4b. Determination
of property
boundaries sup
plementary mea
surements
2 eng.
3 tech.
8 auxil.
1 vehicl.
17
11
34
51
126
374
561
1386
together
46
60
134
504
654
1482
_ _ _