IMPROVEMENT OF QUALITY CONTROL SYSTEM IN CROATIA 
S. Lemajic *, N. RoZié, M. Rapaié 
Croatian Geodetic Institute, Savska 41/XVI, 10144 Zagreb p.p.19, Croatia - hgi@hgi.hinet.hr 
KEY WORDS: Geoinformation project, Data upgrade, Quality control, Quality Plan, Croatian Geodetic Institute, ISO 
ABSTRACT: 
Croatian Geodetic Institute (CGI) was founded in February 2001 and started with professional work at December of 2001. CGI is an 
independent institution but working closely with State Geodetic Administration (SGA). According to Law on State Survey and Real 
Estate Cadastre (Croatian Parliament, 1999) CGI is responsible for scientific geodetic and surveying works and for quality control of 
geodetic products produced by geodetic companies. At the beginning of professional work CGI started with performing of digital 
orthophoto control and analogue topographic maps control. At that time the CGI quality system was not in accordance with ISO 
standards. The Book of Ordinance (State Geodetic Administration, 2001) was the key document for ensuring quality control. Lack 
of software systems and hardware infrastructure, supporting data necessary for quality control, procedures and formal QC 
documentation were the main reason to start establishment and development of new CGI Quality System for quality control of 
geodetic products. Croatian-Norwegian Geoinformation Project (CRONO GIP) started in June 2002. Implementation of component 
c) of the Norwegian assisted Project in Croatia for enhancing the capabilities of the Croatian Government to build a National Spatial 
Data Infrastructure has according to Terms of reference (Statens Kartverk, 2001) three objectives: CGI shall be able to control the 
quality of topographic data produced by geodetic companies for SGA, CGI shall be able to perform satisfactory controlling of the 
quality of topographic maps and orthophotos produced by geodetic companies and CGI shall be able to prepare draft regulations and 
standards in line with international standards, to be applied by geodetic companies for assuring and documenting quality in the 
production of geographic data. Before Implementation of CRONO GIP results, CGI performed the Test Quality Control. The 
Dataset, which was the subject of Control, CGI have controlled according to Specification which are made for Data Upgrade. The 
Results with Reports of Test Control are delivered to Producers for corrections. After Corrections the Structure of Dataset was 
acceptable for further methods of control. 
1. INTRODUCTION - Specification and procurement of 
(hardware and software) 
Education in the use of new equipment (training) 
equipment 
At the end of 2001 CGI started with professional work in the = 
field of control of orthophoto in the scale 1:5000 and control of = Practical execution of controls on products and 
topographic map in the scale 1:25000. The control of these making the reports. 
products was not based on ISO rules. Lack of experience, The realization of the Project is based on a set of 
equipment and specifications which were needed for control, documentations: 
demanded to make full control of these products. Also, before - Products and product specifications 
establishment of CGI there was no institutional system for - A Quality plan 
making quality control but CGI started with improvement of the - A Procedures and checklists 
quality of products. - A. Reporting. 
CRONO GIP which started in June 2002 had a main goal to 
  
improve quality control system in CGI. Consultant Team made 
Inception study report (Program Management and Mapping - 
PMM, 2002) for producing detailed project plan, for reviewing 
all activities defined in Terms of Reference, for verifying the 
project objectives and local awareness for the Project, setting 
guidelines and procedures for execution and building the team. 
The base activity of CRONO GIP which is connected with 
Croatian Geodetic Institute is to establish capacity in CGI to 
control the quality of geodetic data produced by geodetic 
companies for State Geodetic Administration. From the 
beginning, the planned activities if the Project are: 
- Specification and verification of controlling 
procedures and methods for CGI according to ISO 
- Verification of existing documentation with 
comparing to ISO standards 
- A Drafting new regulations and standards 
  
* Slavko Lemajié, dipl.ing.geod. Croatian Geodetic 
slavko.lemajic@hgi.hinet.hr 
Institute, 
1.1 Products 
Product is a set of work results, which can be used for several 
purposes. The Product is defined by Product Specifications. For 
each Product, requirements are set to the Process leading up to 
the final product. These processes are subject to Process 
Specifications. The process specification will mainly be 
required to process documentation. The Process Specifications 
are subject to more frequent changes due to development of 
technology and methodology, compared to the product 
specifications that are of a more permanent character. 
Product Specifications and Process Specifications are related to 
Quality Elements and Quality Sub elements ISO/DIS 19113 and 
ISO/DIN 19114 (International Organization for 
Standardization, 2001 and 2002). Each of these elements is 
described with: 
- Definition of the quality element/sub element 
Savska 41/XVI, 10144 Zagreb p.p.19, Croatia - 
  
12 Q 
Quality 
applied 
deliver 
describ 
underta 
individ 
Develo 
when 
examin 
Project 
again fi 
Execut 
Inspect 
project 
project: 
a) The 
steps: 
When i 
be emp 
The co 
control 
quality 
The dat 
Require 
are star 
The ge 
be iden 
and sar 
geograj 
The coi 
b) Exec 
True va 
Corresy 
differer 
the dis 
current 
Values 
the tole 
whethe
	        
Waiting...

Note to user

Dear user,

In response to current developments in the web technology used by the Goobi viewer, the software no longer supports your browser.

Please use one of the following browsers to display this page correctly.

Thank you.